My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1048
>
2300 - Underground Storage Tank Program
>
PR0231462
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2023 11:31:35 AM
Creation date
6/20/2023 8:50:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231462
PE
2361
FACILITY_ID
FA0000508
FACILITY_NAME
7- ELEVEN INC # 17647
STREET_NUMBER
1048
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
21903003
CURRENT_STATUS
01
SITE_LOCATION
1048 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cable put must he in <br />line with float <br />Meuse SA <br />Testable Mode's Drrty <br />SEE PAGE 8 FOR INSTRUCTIONS USING ME 7150- <br />Mu <br />sEt PAGE g FOR INSTRUCTIONS USING INE 7150- <br />MU, <br />SEE PAGE 10 FOR ONISTNIXTiONs USING THE zias <br />MALT. <br />Node: testvbie 7/50 models ending with er require the <br />71s0,TOOLCT or modirmi 7/50-T001. or 7150- rcoLc <br />STEP & APPLY GREASE TO DROP TUBE <br />Apply biarit rrboly grease to the inside diameter ol the <br />upper cirop tube. Make Sum coverage i 5 corn/Neely <br />around the tube as shown in Rgure <br />Figure S <br />NOTE; Testable inlet tube must have cable port in <br />line with float_ Testable inlet tube bottoms out on <br />stop, it does net bottom out Qni1efsgs. See Fig- <br />ur* IA <br />Figure 6 <br />STEP 7: Apply GREASE TO POI:WAR SEAL, <br />Ensure that the polypak seal is installed on the inlet <br />tithe with the lip up as shown in Figure 7. Apply black <br />moty grease to the poigoak as shown. Make sure cover- <br />age is Docripletey around the polypak seal. <br />Enthure polwak <br />Figure I <br />STEP S: INSTALL INLET TOR E <br />insert the Inlet tube into the upper tube until the uppei <br />tube seats against the flange nil the inlet tube. Ensum <br />polypak is Inserted evenly and stays on inlet tube <br />groove.
The URL can be used to link to this page
Your browser does not support the video tag.