My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1048
>
2300 - Underground Storage Tank Program
>
PR0231462
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2023 11:31:35 AM
Creation date
6/20/2023 8:50:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231462
PE
2361
FACILITY_ID
FA0000508
FACILITY_NAME
7- ELEVEN INC # 17647
STREET_NUMBER
1048
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
21903003
CURRENT_STATUS
01
SITE_LOCATION
1048 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7150-TOOL PROCEDURE BELOW, <br />FOR 71SO-TOOLC, SEE PAGE 9 <br />FOR 7150-TOOLC1, SEE PAGE 10 <br />Nem 7150-TOOL can only be used with testable <br />overfirti valves If modified as shown below. A 2" <br />wide slot must he added to accommodate sact <br />Add r wide <br />Witt° use with <br />testable valves <br />t <br />/ " <br />7150-TOOL Modificetiorti for Testable Inlet <br />Hand <br />tighten <br />knobs <br />evenly <br />Ylitvg holes <br />STEP 9A: INSERT 7150-TOOL OVER INLET TUBE <br />To install the 7150-TOOL (sold separately) over the inlet <br />tube, first loosen all the knobs, so the tool can pass <br />f I eely over the inlet tube flange. Align the slot on the <br />too/ with the key on the /Met tube and insert the tool <br />down Sea Figure 9A. <br />Figure 9A Figure 10.41 <br />STEP 10k TIGHTEN TFIE 71SO-TOOL <br />Use the three view holes to ensure that the tool seats <br />out flat against the top of the inlet tube To pc'eVEnt <br />vertical movement of the tool during drilling, hand <br />tighten all three knobs Pvrn ty to the upper drop tuba <br />see Figure 10A. <br />STEP 11141, PREPARE DRILL AND IT <br />CunArrn that the stop on the 3/i 6' +drill bit supplied <br />with the 71SO-TOOL kin the correct position before <br />drilling. The stop Is factory installed at a distance be- <br />tween 24 to 2-1/16' from the tip with the 7150-TOOL if <br />the stop is not at the correct position it must be frxed <br />before drtIling. <br />ournoN3 If the drill stop is not in the proper loca- <br />tion failure of a pressure decay leek test may result. <br />Tip to stop dimension must be <br />2" to 1-1/16'. <br />Frgsatie 11A <br />STEP 12k DRILL HOLES <br />With the inlet tube and 7150-TOOL in place, carefully <br />drill a3/U5 diameter hole In the upper tube using the <br />drill bushing in Vie knob as a wide. The drill stop is po- <br />sitioned so It will bottom opt against the knob after the <br />bit has &flied through the upper drop tube. If the stop <br />is positioned wvon9 either no hole will be drilled, or a <br />thiough hole could potentially be drilled tibrotroh the <br />}nret tube. If no hole is drilled return to step 1 tA anti <br />check the stop dimension. FE a hole is drilled through <br />the iniet tube or into the screw hole the assembly is llbt <br />sa Krayeable, Drfil {2) more bytes in the two remaining <br />knobs_
The URL can be used to link to this page
Your browser does not support the video tag.