My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1048
>
2300 - Underground Storage Tank Program
>
PR0231462
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2023 11:31:35 AM
Creation date
6/20/2023 8:50:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231462
PE
2361
FACILITY_ID
FA0000508
FACILITY_NAME
7- ELEVEN INC # 17647
STREET_NUMBER
1048
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
21903003
CURRENT_STATUS
01
SITE_LOCATION
1048 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP 20: PREPARE FILL AKER FOR VALVE INSERTION <br />IMPORTANT: inspect The riser pipe for any foreign <br />material, Over sprayfrern tank relining or Jew internal <br />burrs inside of pipe must be removed prior to Installa- <br />tion. Failure to have an unobstructed riser pipe may <br />prevent proper installation or operation of the valve_ <br />Thoroughly dean top of riser pipe. <br />STEP 21: REMOVE ELASTIC RAND <br />Remove the elastic band securing the float to the valve <br />body. The float wilt move Into) an outward position. <br />STEP 22: INSERT DROP TUBE <br />Make sure the upper 04ing gasket is under the flange <br />of the inlet tube. Hold the float down against the valve <br />body and slowy Insert the drop lube overAil varve into <br />the riser pipe. Do not force valve Into the riser pipe. If <br />any obstruction or foreign matter interferes with <br />smooth Iiisertion of the valve, the Ilse( pipe must be <br />cleared. <br />MINK <br />Failure to follow the missend* <br />end InsalLation Instruction' or <br />use of excessive force to inaert <br />the OPW 7150 wiN VOID THE <br />WARRANTY. <br />DAtulty pri rertiov6ny the existing <br />fill tube (if them Is one) means <br />there may be an obstruction in the <br />riser pipe. Look for burrs, defor- <br />mations, excess tank lining mated- <br />di Or Other Waled-fans that may <br />interfere v4th easy insertion of the / <br />OPW 7150. The 715015 deugned <br />for insertion into schedule 40 pipe. If figure 22 <br />schedule 130 pipe has been used for the <br />riser, the 71S0 Cannot be Installed. if warned pipe ha's <br />been Used, the internal wetd bead may interfere with <br />the OPW71.Oafl1 prevent installation. If The ciPw <br />7150 won't sHp in easily DONT FORCE FT! Damage to <br />the valve may result if excecc force is used. Examine the <br />riser pipe carefully, determine the nature of the obstnic- <br />lion; take appropriate steps to remove IL <br />STEP 23: CHECK INSTALLATION <br />Insert the drop tube all the way Into the tank until the <br />flange and gasket seat onto the top of the Face Seal <br />Adaptor. The float will swing out into the operating <br />pas:FL-ion as 't1 panes into the <br />Figure 23 <br />Make sure that the float is aligned along the length ef <br />the tank. The length of the tank can easily be deter- <br />mined by locating other manholes or pomp boxes that <br />are installed around other tank fittings, Look Into the <br />drop tube and align the deflector with the length of the <br />Ilk- <br />For testab e_madets only Unthread the socket adap- <br />tor assembly from the inlet tube (a 3(r square dr ive <br />ectemion will attach to the socket adaptor, secure al/ <br />tools to ensure they don't fall into the tank er valve) and <br />ensure noel and poppet move 1 reely when socket &tip <br />tor assernla.ly IS pulled on. When looking down into the <br />Upper tube ensure poppet is visible when socket adap- <br />tor is pulled and resets properly when socket adaptor is <br />released, See paqc 17 for full testing details_ if poppet <br />does oot actuate freer take appropriate steps to C01712t1 <br />before proceeding. <br />CAUTION: No obstruction in the tank can ha within <br />14" from the center of the riser pipe or the valve <br />may not operate property (See Flours 241. <br />STEP 244 ALIGN VALVE <br />Install the OPW JackScrew IQ and a 4 NPT nipple to <br />lock the valve in place. Refer to the Installation Instruc- <br />tions supplied wfth the Jack Strew Kit. For testable <br />models tniSUre that the socket adaptor Is abetted so <br />it does not interfere with the Jack screw kit. (see Fig <br />ure 24A). Install the Rotatable Product Adaptor (Refer <br />to Installation Instructions supplied with the Product <br />Adaptor.) Make sure that the valve does not rotate <br />while tightening the adaptor by observing the position <br />of the deflector. The vain rnust reiThait gonad *rig <br />thrh lansitk rItPva tank .. lit S'ir 2. flr pattl i sir p <br />a s necessary to assure proper valve alignment. <br />14
The URL can be used to link to this page
Your browser does not support the video tag.