Laserfiche WebLink
Vapor Recovery <br /> � Fill Rises <br /> w <br /> DPW <br /> rl <br /> Ball FloatA nim um <br /> rance for <br /> TubeCut t 4*NPT <br /> per Local +tipple <br /> Requirements <br /> a <br /> .— Align Float Along Leogth of Tank �. Swivel <br /> Figure24 Product 0 Jack <br /> Adaptor Screw <br /> Kit <br /> Onent socket <br /> adaptor Ix- FOR TESTABLE AWO ELS GNLY_ Check install a6ori <br /> tween jack again as done in Step 23 to ensure poppet actuates and <br /> screwy Isolts resets properly, See page 17 for fua testing details_ Ap- <br /> ply pipe dope to the socket adaptor threads. Pipe dope <br /> should be a non-hardening gasoline resistant pipe <br /> thread seal compound. Install socket adaptarand <br /> torque to 35 ftAbs(42 in-)bs)minimum to 5.0 ft-lbs(60 <br /> in-Itis) maximum. Aper installing socket adaptor where <br /> requi red,pressure test testable overfill valve per CARR <br /> TP201.1 D to ensure valve is vapor tight <br /> lure ISA <br /> 15 <br />