My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1399
>
2300 - Underground Storage Tank Program
>
PR0231435
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2024 11:23:47 AM
Creation date
6/20/2023 9:28:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0231435
PE
2361
FACILITY_ID
FA0000916
FACILITY_NAME
7-ELEVEN INC #19976
STREET_NUMBER
1399
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
21633034
CURRENT_STATUS
01
SITE_LOCATION
1399 N MAIN ST
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP 25: INSTALL WARNING PLAYS <br /> Bend the three warning plate ears down then slide the <br /> tie wrap owr the warning pkate ears and positi0 n waro- <br /> ing plate against riser pipe approximately 1"below the <br /> adaptor. Tighten the#le wrap securely. The valve is <br /> rpow ful[y Installed and In operating position. <br /> NOTE: the warnkV p1W*N.ch,des impatent waro- <br /> ings,ope'atin4 paramours,vW listbp infpmnetion r <br /> and must ba inttaMsd. <br /> fl <br /> Manu actwer-'015 " <br /> 4 <br /> POO <br /> Model:*7150-4- <br /> (4* <br /> 7150-4"(4"repr+e"nts size) <br /> Manufacture Date: <br /> "MFG NWAYY' <br /> MM--Month YY=Year <br /> PTgws 26-PrOdwf&end6cadan <br /> ft"25 <br /> STEP 2b: VALVE RERWAL <br /> The valve can be rernaved for tank leak testing,Insgec- <br /> tlon,etc,by removing the Rotatable Product Adaptor, <br /> the 4"nipple,and the Jack Screw Kit. Reinstall per the <br /> above insmictions. <br /> Por testebie models only: It is not necessary to re- <br /> mwe the valve to check poppet movement/functian. <br /> See Page 17 for full testing details. <br /> STEP 27; ELECIMONIG LIQUID UVEL MONffOWNG <br /> if an electronic level monitor iS installed, it rnust be cali- <br /> brated to match the top of the 7150 valve body,which <br /> must ccrrel ate with 95%of the actual tank capacity, <br /> �F <br />
The URL can be used to link to this page
Your browser does not support the video tag.