Laserfiche WebLink
<br />C:\TRICH\Jobs\4515582 Leprino Tracy\Report\Leprino Tracy CalARP 040221.docx 3-1 <br />3. Engineering Review of Tanks & Equipment <br />Covered by CalARP Program <br />The following tasks were performed for the engineering review of tanks, equipment and <br />piping holding State Regulated Substances per CalARP Program Requirements: <br />• Review of available tank, equipment and foundation drawings. <br />• Conduct detailed seismic walkdown of the tanks and associated equipment and <br />piping. <br />• Evaluate seismic capacity of the covered tanks and equipment. <br />A summary of the tanks and equipment reviewed as part of this evaluation is included in <br />Table 3-1. Table 3-2 summarizes whether recommendations from the previous <br />evaluation have been incorporated and/or whether the current evaluation results in new <br />recommendations. Any calculations performed as a part of this evaluation are presented <br />in Appendix C. <br />3.1 Review of Design Information <br />The purpose of the design information review was to determine the level of conservatism <br />in the original design of the equipment anchorage, and to obtain necessary data for field <br />verification and additional seismic analyses. Typical design data to be reviewed <br />included: <br />• Plot plan showing equipment locations. <br />• Soil report or geotechnical report. <br />• Existing drawings showing tank and equipment configurations and any other <br />information regarding dimensions, operating weights, design loads, and material <br />properties.