Laserfiche WebLink
Tracking No. <br />AFE No. <br />AUTHORIZATION FOR EXPENDITURE (AFE) <br />PRODUCTION DIVISION <br />AFE No. <br />APPROVED IN BUDGET [ ] Yes [ ] No <br />IF YES, AMOUNT <br />COMPLETION DATE FINANCING PURCHASE LEASE CURRENT PROJECT $ <br /> <br />TOTAL PROJECT $PROJECT TITLE <br />THIS REQUESTPROJECT PRIORITY <br />START DATE IN-HOUSE <br />LOCATION COST CENTER DATE SUBMITTED <br />TOTAL PROJECT $ <br /> <br />PROJECT DESCRIPTION (INCLUDE BACKGROUND AND OBJECTIVES) <br />PRESENT CONDITION: <br />AREA CSI CODE CAPITAL EXPENSEDESCRIPTION <br />Submitted by: <br />NOTE: IF EXISTING ASSETS ARE BEING REMOVED OR REPLACED, PLEASE ATTACH SURPLUS EQUIPMENT AND ASSET DISPOSITION FORM. <br />PROPOSED SOLUTION: <br />SIGNATURE DATE <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />A.F.E.. ORIGINATOR <br />DEPARTMENT MANAGER <br />SIGNATURE DATE <br />MAINTENANCE MANAGER <br />PLANT ENGINEER <br /> <br /> <br /> <br /> <br /> <br />Exec. Overview <br />PLANT MANAGER <br />REGIONAL CONTROLLER <br />ATTACHMENTS <br />Project Cost Est. <br />Payback Analysis <br />SAFETY COORDINATOR <br />PLANT CONTROLLER <br />Competitive Bids <br />Project Schedule <br />Project Drawings <br />REGIONAL V.P. <br />CONSTRUCTION CONTRACTS <br />PRODUCTION CONTROLLER <br />TECH SVCS DIRECTOR <br />MAJOR COST SUBTOTAL: <br /> <br />FREIGHT:Unit Bid Analysis <br />TAXABLE AMOUNT and RATE <br />TOTAL CAPITAL & EXPENSE PROJECT COST(s) <br />Contingency Plan <br />PRESIDENT <br />CHAIRMAN of the BOARD <br />Sr. V.P. PRODUCTION <br />TECH SERVICES V.P.K-T Analysis <br />Audit Plan <br />Asset Disposition <br />FREIGHT: <br /> @ <br />108018207-02 <br />Tracy 20043 <br />✔ <br />11/27/2018 <br />High <br />$507,998 <br />Upon Approval ✔$175,970 <br />Storage Freezer Ice Safety Improvements - Supplement 2 Hot Gas Lines <br />This supplement for the WHSE doors is to add hot gas to the heating coils instead of using the electric heaters they come with. This <br />warm air is required so we don't have any moisture on the blown air across the new doors. <br />We would like to add hot gas because it's free heat we have on the ammonia side already. The electric heaters will also require more <br />upkeep on them instead of basic coils. This will not expand out ammonia quantity. We will run new hot gas lines from existing lines <br />nearby. <br />Ben Schlegelmilch <br />Ben Schlegelmilch <br />48 15100 Run Hot Gas Lines to HCR Doors (5% <br />Contingency)$160,850 <br />48 7500 Seal Roof Penetrations $10,000 <br />Doug Chitwood <br />Ben Schleglemilch <br />Toby Paluck <br />✔Lisa Melo <br />✔Kim Miller <br />✔Ron Walker <br />✔Gary Germaine <br />$513 <br />$170,850 $0 <br />✔Bud Lehmkuhler <br />✔Doug Brasier <br />✔Sally Rush <br />✔Terry Anderson <br />Tom Hegarty $55,834 $4,6068.250% <br />Mike Durkin <br />Jim Leprino $175,970 $0