Laserfiche WebLink
AFE TRACKING #: <br />DATE: <br />SUBMITTED BY: <br />EXECUTIVE OVERVIEW <br />Background: <br />Justification: <br />Timeline: <br />EXEC OVERVIEW (1) Page ____ of ____ <br />The storage freezer in Tracy has severe concerns around ice and frost. Ice and frost build up along the ceiling as well <br />as the floor of the freezer. This creates a hazard for ice falling on employees, and forklifts or employees slipping and <br />falling. In April of 2018, we had an OSHA recordable due to an employee slipping in the freezer. <br />With tech services help we have reviewed how moisture is getting into the freezer, and we will eliminate the ice and <br />frost issues in the freezer by resolving several known problems. <br />The entry doors into the freezer allow significant amounts of moist air to flow into the freezer. If you stand at any of <br />these doorways you can feel and see a cloud of moist, warm air being sucked in. You can also see significant frost and <br />ice build-up on the ceiling above each of these doors. <br />Supplement #2 is to install hot gas lines to the heaters. We will tie into existing ammonia hot gas lines nearby for other <br />equipment to use to the heat on the coils to keep the air for the doors dry. <br />We need to stop the flow of this air into the freezer. We have tried several things on our own, but nothing has made a <br />difference. We worked with one of our contractors to correct the issue and they led us to installing HCR doors which <br />will create a blockage of air flow into and out of the freezer. <br />Several team members from Tracy viewed these doors in operation at Costco meats in Tracy. Their doors were <br />installed over 10 years ago, and their freezer freezer was in immaculate condition with zero frost anywhere. <br />The truck dock side needs to have a double conditioned door so their is an air block on both sides of the freezer. The <br />rail dock only needs a air block on one side due to having the new high speed doors in place on that side already. The <br />pallet entry door system needs to be completely replaced with a double conditioned door with a door in the middle of it. <br />This is the cheaper and more cost effective approach in the long run. The electric heaters will fail more often due to <br />other components the hot gas coil doesn't need. This can create issues with the doors not functioning. <br />We would install these at the same time we're doing the door. We need a down day to cut into the ammonia system. <br />108018207-02 <br />11/27/2018 <br />Ben Schlegelmilch <br />Storage Freezer Ice Safety Improvements - Supplement 2 Hot Gas Lines