My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 12:03:45 PM
Creation date
8/16/2023 2:19:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
474
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FORWARD LANDFILL <br /> RESOURCE & RECOVERY <br /> 2023-2024 WINTERIZATION PLAN <br /> October 2023 <br /> 1. Grinding Pad& Sorting Pad <br /> The pad has been graded such that the water flows to one of three onsite conveyances leading <br /> directly to the lined impoundment on the west side of the Resource&Recovery(R&R) area. <br /> 2. Compost Pad <br /> Composting activities are being performed on an approximately 20-acre area. The composting <br /> activities are limited to green waste materials. <br /> 3. Transfer Station <br /> The transfer of recyclables is performed within the twelve thousand square feet(12,000 sq)building <br /> located on the eastern end and middle (North-South) of the R&R area. Rainwater from the roof <br /> of the building is directed from the down spouts to the existing conveyances and then to the lined <br /> impoundment. <br /> 4. Lined Impoundment <br /> All water is held in the lined impoundment and then sampled and analyzed in accordance with <br /> applicable Regional Water Quality Control Board(RWQCB)monitoring requirements. <br /> 5. Roads <br /> All roads have been graded to provide a safe and stable surface for travel and to direct runoff to the <br /> existing conveyances that route to the lined impoundment. Roads will be cleared of mud as needed <br /> to prevent tracking onto Austin Road. Forward has constructed a tire wash station along the main <br /> exit road of the FRRF that is used to clean truck tires. The tire wash station was completed in July <br /> 2014. In addition, exit roads and Austin Road will be reviewed on an hourly basis and will be <br /> cleaned by sweeper truck and water truck,as needed,to prevent any build-up of mud. <br />
The URL can be used to link to this page
Your browser does not support the video tag.