My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 12:03:45 PM
Creation date
8/16/2023 2:19:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
474
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The main access road, scales, and scale house for the Forward Landfill are in the northeast corner <br /> of the site.Trucks enter the landfill at the main entrance gate and then turn immediately north along <br /> a main entrance road that runs parallel to Austin Road. <br /> The exit road from the landfill is paved to prevent track-out. In 2013 Forward constructed a tire <br /> wash station along the south side of main landfill exit road to efficiently clean truck tires and then <br /> extended the length of the tire wash by 30-ft in 2015. In 2019, Forward constructed an additional <br /> tire wash on the north side of the main exit road, The 2019 tire wash is similar to the tire wash <br /> constructed in 2013/2015. In addition to the tire washes, exit roads and Austin Road will be <br /> reviewed on an hourly basis and will be cleaned by sweeper truck and water truck, as needed, to <br /> prevent any build-up of mud. <br /> 8. Winter Deck <br /> The winter deck is constructed using a 6-inch thickness of a combination of gravel, crushed, and <br /> concrete road base. The winter deck is located on the southwest side of WMU FU-19 with a <br /> dimension of approximately 260-ft by 380-ft(see Figures 1 &2). <br />
The URL can be used to link to this page
Your browser does not support the video tag.