My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
COMPLIANCE INFO_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 12:03:45 PM
Creation date
8/16/2023 2:19:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
474
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Landmarc Environmental Systems,LLC Site-Specific Health&Safety Plan(SSHSP) <br /> TREMCNINN-EX AVATIRN <br /> 7.3.1 DAILY COMPETENT PERSON IN S PE TII0N EXCAVATION I <br /> TRENCH INSPECTION REPORT <br /> Competent Person: Date: <br /> Project Name: Weather Conditions: <br /> Project Location: Rainfall Amounts 24 hours Previous: <br /> "I hereby attest that the following conditions existed and that the following items were checked-or <br /> reviewed during this inspection"_ <br /> Check Yes, No or NIA for Not Applicable. <br /> 1. Are barricades or covers in place and in good condition? <br /> 2. Have any tension cracks observed along top on any slopes? <br /> 3. Is excavated material at least 2'from the edge of the excavation? <br /> 4. Are slopes cut at design angle of repose's <br /> 5. Is any water seepage noted in trench walls or bottom? <br /> 6. Are pumps in place or available if needed? <br /> 7. Is bracing system installed in accordance with design? <br /> a. Is there evidence of significant fracture planes in soil or rock? <br /> 9. Is there any evidence of caving or sloughing of soil since the last <br /> inspection's <br /> 10. Are there any zones of unusually weak soils or materials net <br /> anticipated? <br /> 11. Are there any noted dramatic dips or bedrock? <br /> 12. Are all short-term trench(s) covered within 24 hours? <br /> 13. Have non-compliance items been photographed? <br /> 14. Are hydraulic shores pumped to design pressure? <br /> 15. Is shoring being used secure? <br /> 16. Does plan include adequate safety factor for equipment being used? <br /> 17. Is traffic adequately away from trenching operation's <br /> 18. Are barricade up and secure? <br /> 19. Are there trees, boulders or other hazards in area? <br /> 20. Is vibration from equipment or traffic to close to trenching <br /> operation's <br /> 21. Are trench box(s) certified? <br /> 22. Are CFCI's used on ALL temporary electrical cords? <br /> 23. Is access and egress located every 25 feet? <br /> 24. Is hazardous testing done on a regular basis? <br /> 25. Pas rescue procedure been established and is equipment <br /> i-ii i—eIiataly available? <br /> 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.