My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0015801
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
20042
>
2600 - Land Use Program
>
PA-2200137
>
SU0015801
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2024 1:55:05 PM
Creation date
8/31/2023 1:18:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0015801
PE
2675
FACILITY_NAME
PA-2200137
STREET_NUMBER
20042
Direction
W
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95377-
APN
20910019, 99B-7885-002, 99B-7590-1-3
ENTERED_DATE
8/29/2023 12:00:00 AM
SITE_LOCATION
20042 W PATTERSON PASS RD
RECEIVED_DATE
11/14/2023 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
987
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 Environmental Analysis <br /> 4.14 Public Services <br /> iii) Schools (No Impact) <br /> The nearest schools to the Project site are the Peter Honsen Elementary School, George Kelly <br /> School (K-8), Wanda Hirsch Elementary School, Earle E. Williams Middle School, and John C. <br /> Kimball High School, as well as Mountain House Elementary School in Alameda County nearest <br /> the gen-tie line. The Project would require a temporary workforce for construction and eventual <br /> decommissioning, and one or two workers during Project operations to visit the facility on a weekly <br /> basis. Thus, the Project is not anticipated to contribute an increase in population or the associated <br /> potential increase in school-aged children and, therefore,would not result in any increase demand <br /> for schools. The Project will pay any applicable school or other impact fees. The Project would <br /> not result in any impacts associated with the provision of new or physically altered school facilities <br /> or need for new or physically altered school facilities, the construction of which could cause <br /> significant environmental impacts to maintain acceptable service ratios, response times, or other <br /> performance objectives for schools. <br /> iv) Parks (No Impact) <br /> The nearest park, Marlow Brothers Park, is a small local park managed by the Tracy Parks and <br /> Recreation Department and is approximately 5.5 miles from the Project site. The Project is not <br /> anticipated to contribute to an increase in population and, therefore, would not result in any <br /> increase demand for park facilities. Accordingly, the Project would not be required to pay in-lieu <br /> fees as described in General Plan Policy NCR-8.22 above. <br /> Tex Spruiell Park in is the nearest park to the gen-tie line in Alameda County The Project, <br /> including the gen-tie line, would not contribute to an increase in population and, therefore, would <br /> not result in an increased demand for park facilities. All applicable impact fees would be paid by <br /> the Project. <br /> The proposed Project would not result in population growth that would be associated with the <br /> provision of new or physically altered park facilities or need for new or physically altered park <br /> facilities. As such, the Project would not cause significant environmental impacts to maintain <br /> acceptable service ratios or other performance objectives for any park services. <br /> v) Other public facilities (No Impact) <br /> The Project is not anticipated to contribute to increased population growth. It is not anticipated <br /> that the demand for public facilities, such as libraries or other facilities, would be created. <br /> Therefore, the Project would not result in any impacts associated with the provision of new or <br /> physically altered public facilities or need for new or physically altered public facilities, the <br /> construction of which could cause significant environmental impacts to maintain acceptable <br /> service ratios, response times, or other performance objectives for any other public facilities. <br /> Mitigation: None required. <br /> 4.14.5 PG&E Tesla Substation Improvements and Gen-tie <br /> To accommodate the Project, PG&E would be responsible for siting, design, and construction of <br /> the gen-tie line from the point of change of ownership (POCO) to its substation. Two options are <br /> Griffith Energy Storage Project 4.14-7 Tetra Tech/SCH 2022120675 <br /> Draft Environmental Impact Report August 2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.