Laserfiche WebLink
LESA Model Administrative Draft <br /> Griffith Energy Storage, LLC Technical Memorandum <br /> maintained as park,forest,or watershed resources;Williamson Act contracted lands;and lands with natural <br /> resource easements that restrict the conversion of such land to urban or industrial uses. <br /> The Zone of Influence is the amount of surrounding lands up to a minimum of one-quarter mile from the <br /> project boundary.Table 4 summarizes the findings for the proposed Project. <br /> Table 4. Surrounding Agricultural Land Rating <br /> A B C D E F G <br /> Zone of Influence Surrounding <br /> Surrounding <br /> Acres in <br /> Acres of Percent in Percent Protected Agricultural Protected <br /> Total Acres Agriculture1 Land Score2 Protected Agriculture Resource Land Resource Land <br /> Resource Land1 (BIA) (CIA) Score2 <br /> 862.00 842 106 98% 0.1 90 0 <br /> Land use was determined based on data from San Joaquin County District Viewer(San Joaquin County 2022). <br /> 2Score was determined from the scoring table from the LESA Instruction Manual(CDC 1997). <br /> Final LESA Score Sheet <br /> The California LESA Model is weighted so that 50 percent of the total LESA score of a given project is derived from the <br /> Land Evaluation factors,and 50 percent from the Site Assessment factors.Table 5 provides the calculation of a final LESA <br /> score of 46.04 for the proposed Project. <br /> Table 5. Final LESA Score Sheet <br /> Factor Scores Factor Weight Weighted Factor Scores <br /> Land Evaluation Factors <br /> Land Capability Classification 55.50 0.25 13.87 <br /> Storie Index 62.68 0.25 15.67 <br /> Land Evaluation Subtotal 0.5 29.54 <br /> Site Assessment Factors <br /> Project Size 0 0.15 0.00 <br /> Water Resource Availability 20 0.15 3.00 <br /> Surrounding Agricultural Land 90 0.15 13.50 <br /> Protected Resource Land 0 0.05 0.00 <br /> Site Assessment Total 0.5 16.50 <br /> Final LESA Score 46.04 <br /> 3.0 Final Result <br /> According to the California Agricultural LESA Model Instruction Manual,a final LESA score ranging from 40-59 points is <br /> considered significant only if both the land evaluation and site assessment weighted factor subscores are each greater <br /> than 20 points(CDC 1997). For the proposed Project,the land evaluation score exceeds 20 points;however,the site <br /> assessment score is below the 20-point threshold.The proposed Project will not have a significant impact on agricultural <br /> land use within the Project area or Zone of Influence(Table 6). <br /> TEFRA TECH <br /> 4 <br />