Laserfiche WebLink
sss.Landscape slopes within street right of way, pedestrian access connections, and parks <br /> shall not exceed 3:1 unless approved otherwise by the MHCSD General Manager. <br /> ttt. The applicant shall update as necessary the Neighborhood B In-tract Landscape <br /> Guidelines in incorporate Tract 4099. Timing: prior to issuance of the first building <br /> permit. <br /> uuu. Lots 1-5 shall front or give the appearance of fronting onto Central Parkway. There <br /> shall be a white picket fence consistent with the MHCSD Design Manual and <br /> Standards behind the property along Central Parkway. The sidewalks to the front <br /> doors of these homes shall connect to the existing sidewalk along Central Parkway. <br /> Prior to improvement plan submittal. <br /> vvv.A white picket fence consistent with the MHCSD Design Manual and Standards shall be <br /> installed behind the property line for Lots 58-61 and Parcel A. Shown on updated <br /> Neighborhood B In-Tract Landscape Guidelines prior to approval. <br /> www. The landscaping and architectural design of all parcels, designated as HOA or Landscape <br /> Maintenance District, shall be consistent with all Community Approvals including <br /> applicable provisions of MHCSD Design Manual and MHCSD Standards. The design <br /> plans associatedwith each phase of the development shall be completed and approved by <br /> the MHCSD General Manager prior to the approval of the Final Map for that phase. <br /> xxx.Community Park land identified within Specific Plan III shall be dedicated to MHCSD on a <br /> minimum of a pro rata basis, as determined by MHCSD, with the applicant to pay fair share <br /> of all park improvements. Timing: prior to approval of first Final Map. <br /> yyy.The MHCSD General Manager may allow the South Community Park to be constructed in <br /> phases to be consistent with usage demand and other public interest considerations. The <br /> final design of the first phase of the South Community Park shall be completed before its <br /> construction. Construction of the first phase of South Community Park shall begin no later <br /> than the time at which 50% of the dwelling units permits for Specific Plan III have been <br /> issued a building permit. The Park shall be completed no later than the time at which 80% <br /> of dwelling units for the Specific Plan III have been issued building permits. Completion time <br /> of park phases and/or the entire park may be modified by the MHCSD General Manager to <br /> reflect construction, weather, budget, or other public interest contingencies. This condition <br /> may also be satisfied through payment of the project's park fees through the CFD (as <br /> defined below). <br /> FIRE CODE COMPLIANCE <br /> zzz.Prior to the beginning of the final design of the facility, the Developer shall consult with Mountain <br /> House Fire regarding emergency access to the proposed development. Any requirements for <br /> emergency access shall be approved by MHCSD. Install fire hydrants per MHCSD Standards <br /> and State Fire Code. The project shall include on-site fire hydrants. <br /> aaaa. Install fire hydrants per MHCSD Standards and State Fire Code. The project shall include on- <br /> site fire hydrants. <br /> bbbb.All street standards shall comply with the State of California Fire Code provisions, as <br /> interpreted and implemented by the San Joaquin County Fire Marshall and Mountain House <br /> Fire Department. <br /> OTHER OBLIGATIONS AND AGREEMENTS <br /> cccc. Prior to improvement plan approval, the Developer shall execute an Improvement Agreement <br /> with MHCSD and post the appropriate bonds based on Final Engineer's Estimate. <br /> dddd.Stormwater Management Agreement: Prior to the issuance of the first building permit, the <br /> Developer shall enter into a Stormwater Management Agreement with MHCSD and pay all <br /> Resolution Template 01/2023 <br />