My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0015842
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
19300
>
2600 - Land Use Program
>
PA-2300150
>
SU0015842
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2024 8:02:20 AM
Creation date
9/21/2023 10:15:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0015842
PE
2611
FACILITY_NAME
PA-2300150
STREET_NUMBER
19300
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
MOUNTAIN HOUSE
Zip
95391-
APN
20906068
ENTERED_DATE
9/21/2023 12:00:00 AM
SITE_LOCATION
19300 W GRANT LINE RD
RECEIVED_DATE
9/20/2023 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of-way. <br /> x. Hold Harmless Provision: The Developer shall defend, indemnify, and hold harmless the MHCSD, <br /> its agents, officers, and employees, from any claim, action, or proceeding against the MHCSD, its <br /> agents, officers, or employees, to attack, set aside, void, or annul an approval of MHCSD <br /> concerning any MHCSD condition, which action is brought within the time provided for in Section <br /> 66499.37 of the Government Code. <br /> y. Complete, replace or install any missing or damaged frontage improvements on all sides along the <br /> edges of the development. <br /> z. All residential buildings shall be wired per the specifications in the MHCSD "Low Voltage <br /> Construction Pre-Wire Guidelines" and other specifications provided by MHCSD or equivalent <br /> prior to certificate of occupancy. <br /> aa. Deferring Improvements: It is possible that the MHCSD may allow the deferring of street <br /> improvements (including utilities). If the developer wishes to pursue this option, then a formal <br /> written request shall be submitted to the MHCSD after the Tentative Map has been approved but <br /> before the approval of the Final Map. The request should define those street improvements that <br /> the developer wishes to defer. If the MHCSD should approve the deferment, it will be conditioned <br /> in the developer agreeing to construct the deferred improvements within a specified future time <br /> period and entering into a subdivision improvement agreement with MHCSD and a security, such <br /> as a bond, be provided the MHCSD guaranteeing the developer's performance. <br /> bb. If the applicant elects to record and or develop the subject tract in phases a phasing plan shall <br /> be required. Each phase must be able to stand alone as a separate project and not be reliant on <br /> subsequent phases. A subdivision agreement and appropriate bonding shall be executed <br /> between the MHCSD and the developer for each phase in question prior to the approval and <br /> recordation of the Final Map associated with any given phase. <br /> cc. If the land covered by the Tentative Map is to be developed in phases, then the boundary of each <br /> phase shall be determined by the following access requirements: <br /> • Two points of access shall be extended to streets having a classification of residential <br /> collector or higher.Timing: Prior to final map approval. <br /> • If a phase boundary is to parallel the alignment of an in-tract street, then the boundary <br /> shall be along the rear line of the lots facing the street. Boundary lines along the centerline <br /> or edge of a right-of-way line of a street shall not be allowed, except when specifically <br /> approved in writing by the General Manager of the MHCSD. Timing: Prior to final map <br /> approval. <br /> • Prior to the beginning of the final design of the subdivision, the MHCSD General Manager <br /> shall consult with Mountain House Fire regarding emergency access to the proposed <br /> development. Any requirements for emergency access shall be approved by MHCSD. <br /> Timing: Prior to final map approval. <br /> • Masonry walls shall be installed at the property line between residential properties and all <br /> public parcels. <br /> dd. The MHCSD General Manager may allow part of the street improvements noted in the condition <br /> above to be installed by the developer if the particular street falls along the border of the Tentative <br /> Map or separates the proposed phase with a future phase. Under this exception, the completion of <br /> the full street improvements will be the responsibility of future adjacent developments. For this <br /> exception, the developer shall be required to construct the full street improvements to the street <br /> centerline plus the remainder of the median improvements (if part of the street design) plus one <br /> additional travel lane on the opposite side of the median, plus a paved shoulder. Additional far side <br /> travel lanes may be required if found necessary as a result of a traffic study performed by the <br /> MHCSD. Reliance on a future adjacent development to complete the street improvements does <br /> not relieve the initial developer from designing and constructing drainage facilities to serve the <br /> exempted improvement area. Timing: Prior to final map approval. <br /> Resolution Template 01/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.