My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2023 RFI
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
30703
>
4400 - Solid Waste Program
>
PR0505006
>
COMPLIANCE INFO_2023 RFI
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2024 3:58:28 PM
Creation date
10/2/2023 2:45:35 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2023 RFI
RECORD_ID
PR0505006
PE
4445
FACILITY_ID
FA0006475
FACILITY_NAME
TRACY MATERIAL RECOVERY/TRANSF
STREET_NUMBER
30703
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
25313019
CURRENT_STATUS
01
SITE_LOCATION
30703 S MACARTHUR DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
759
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Transfer/Processing Report <br /> Tracy Material Recovery& Transfer Facility <br /> 30703 S. MacArthur Drive, Tracy, California 95377 <br /> Drainage Control <br /> Surface water runoff, including all process water, will be directed to a onsite <br /> retention basin by use of grading design and drainage ditches, where it will be <br /> properly treated, if necessary, to eliminate potential environmental impacts. Water <br /> will be pumped from the retention basin for facility use in operations, including fire <br /> and dust control. <br /> The retention basin has been designed to retain all surface water runoff resulting <br /> from a 100-year, 24-hour storm event. Site personnel will regularly inspect and <br /> maintain the drainage ditches and basin. <br /> The operator implements Best Management Practices (BMPs). BMPs included in <br /> the site's Storm Water Pollution Prevention Plan (SWPPP) include such <br /> management practices as required of the National Pollution Discharge Elimination <br /> System (NPDES): <br /> • Storing recycled materials on a slightly sloping paved area (to prevent ponding) <br /> with a drainage system. Prevent run-on and runoff by directing drainage around <br /> storage areas. <br /> • Sweeping parking areas, storage areas, and processing areas regularly to <br /> remove fine particles of material and dust. <br /> • Storing household hazardous materials from the load checking program in an <br /> approved household hazardous materials storage compartment and in <br /> accordance with federal, state, and local requirements. <br /> • Conducting all vehicle maintenance within the existing maintenance shop at the <br /> facility. <br /> • Spill prevention, control, and cleanup program <br /> • Training employees in implementation of BMPs <br /> The amount of free liquids expected to be generated from solid waste transferring <br /> activities within the fully enclosed transfer station are minimal, even during inclement <br /> weather. As a preventative measure, the concrete slab within the MRF building has <br /> been slightly concaved to pond any free liquid on the tipping pad where drier solid <br /> waste can absorb the liquids as the solid waste is processed for transferring into the <br /> loading bays. Should liquids become excessive, chipped green waste from the <br /> compost operations can be applied to the tipping pad area to absorb the liquids. The <br /> materials would then be transported off-site for disposal at a permitted solid waste <br /> facility. <br /> The Tracy MRF is designed in a manner that rain water that falls on the building will <br /> be treated as storm water and be disposed of in the storm water system. Storm <br /> water generated by rainfall in the ramp to the covered loading bays will be managed <br /> as storm water as grated trench drains will be put in place to not have this storm <br /> water come in contact with any solid waste within the covered loading pit. Drains <br /> 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.