My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
18095
>
2300 - Underground Storage Tank Program
>
PR0548699
>
INSTALL_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2024 3:23:19 PM
Creation date
10/3/2023 5:01:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2023
RECORD_ID
PR0548699
PE
2351
FACILITY_ID
FA0027873
FACILITY_NAME
ARCO AMPM-MOUNTAIN HOUSE
STREET_NUMBER
18095
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
MOUNTAIN HOUSE
Zip
95391
CURRENT_STATUS
03
SITE_LOCATION
18095 W GRANT LINE RD
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OPW 42" DIA. SINGLE–PORT FILL SPILL <br /> CONTAINMENT ASSEMBLY W/ (1) 5 GALLON SPILL <br /> BUCKET AND ADJUSTABLE FLARED SKIRT <br /> 4 FILL ADAPTER AND CAP IN SPILL 4" MIN. TO Z - r <br /> CONTAINMENT FILL BOX (TYP.) TOP OF SPILL 5 GALLON SPILL CONTAINER. <br /> WATERTIGHT SUMP SHIELD BUCKET (INLINE DRAIN ON FILL BUCKET ONLY) <br /> H <br /> a <br /> BOOT AND CLAMPS18" 42>' THICKENED CONCRETE LV <br /> MINI HYDROSTATIC P•) SLAB (TYP.) V <br /> SUMP SENSOR Z <br /> 0 <br /> 41 <br /> (TAPE z <br /> U <br /> d. M NTH » <br /> 26cg <br /> MAX.) <br /> PEA GRAVEL BACKFILL (TYP.) Sk <br /> W a, <br /> 6" WIDE DETECTABLE UNDERGROUND o `� <br /> 2–IN-1 SENSOR BOX - o o - MARKING TAPE <br /> M 7 <br /> JUNCTION BOX EMPIRE MAGNATEC #32-143 V M Q <br /> 4" GALV. STEEL RISERS STAGE I VAPOR <br /> SEE STATIC GROUNDING DETAILS Q o Q <br /> ON SHEET G.0.7.2 (TYP.) RISER IS IN SAME PLANE AS TANK LEVEL � o <br /> GAUGE IN THIS VIEW <br /> #4 STRANDED BARE CU <br /> GROUND WIRE TO OTHER CONTRACTOR TO INSTALL CLEVIS N co > a <br /> TANKS (TYP.) AND COTTER PIN <br /> #4 STRANDED BARE CU TANK GAUGE ADAPTER >_ <br /> GROUND WIRE TO & CAP <br /> M <br /> GROUND ROD (TYP.) VEEDER ROOT .1 GPH MAGNOSTRICTIVE <br /> 1" FRP BONDED ENTRY FITTING PROBE TANK LEVEL PROBE W/ TLS CAP <br /> & RING. OVERFILL ALARM SET © 90% <br /> (TYP.) z CAPACITY. USE 2" FLOAT IN INSTALL KIT <br /> 1" MONITORING CONDUIT <br /> (ROUTED TO INTERSTITIAL) 00 <br /> (ROBROY THROUGH SUMP ONLY) <br /> 42" DOUBLE WALL POLYGON SUMP <br /> BODY (8) FLAT PANELS <br /> SUMP MONITOR LIQUID SENSOR <br /> MOUNTED IN HOLDER <br /> STRAIGHT DROP TUBE z <br /> 0 <br /> WITH FLAPPER (TYP.) in <br /> Ld <br /> SUMP TEST PLUG (TYP.) <br /> A: SECTION VIEW - FILL SIDE SUMP <br /> SCALE: 3/4" = 1'-0" (DIESEL TANK) <br /> SUMP MONITORING LIQUID 8" ACCESS PORT <br /> SENSOR <br /> VEEDER ROOT .1 GPH MAGNOSTRICTIVE <br /> _ � Cn PROBE TANK LEVEL PROBE W/ TLS CAP <br /> & RING. OVERFILL ALARM SET © 90% <br /> w <br /> J of <br /> > CAPACITY. USE 2" FLOAT IN INSTALL KIT a <br /> � a o <br /> MANWAY JACK SCREW (TYP.) <br /> 0 <br /> z <br /> TANK <br /> 4" FILL ADAPTER AND CAP IN SPILL <br /> CONTAINMENT FILL BOX <br /> ALL MANHOLE ACCESS COVERS TO BELOW GRADE <br /> SHALL BE LIQUID TIGHT AND LOCKABLE <br /> 0 00 0000 0 o e 0 OPW 42" DIA. SINGLE–PORT FILL SPILL <br /> CONTAINMENT ASSEMBLY W/ (1) 5 GALLON <br /> SPILL BUCKET AND ADJUSTABLE FLARED <br /> SKIRTL� <br /> DIAMOND PLATE 42" DIA. BRINE MONITORED DOUBLE WALL <br /> CONTAINMENT SUMP (TYP.) <br /> NOTES <br /> NOTE: <br /> CONNECTION TO STAGE II VAPOR RECOVERY SLOPE CONCRETE AWAY FROM ALL MANHOLES 1" RISE OVER 12" RUN <br /> B: PLAN VIEW - FILL SIDE SUMP NOT REQUIRED ON DIESEL TANK. <br /> FIBER REINFORCEMENT TO BE USED. PRE–MIX UNIFORMLY THROUGHOUT CONCRETE. <br /> SCALE: 3/4" = 1'-0" (DIESEL TANK) <br /> REINFORCING BARS TO BE NO LESS THAN 2" AND NO MORE THAN 4" FROM SURFACE. <br /> REINFORCE CONCRETE SLAB AROUND MANHOLE WITH 4–#3 REBAR 60" IN LENGTH. <br /> 33" O.D. (SINGLE FILL) PLACE REBAR 6" FROM SIDES OF BOX. <br /> ONE 1" STANDARD MONITORING HOMERUN CONDUIT TO EACH TANK. FOR STANDARD <br /> MONITORING DEVICES, LOOP CONTAINMENT SUMP SENSORS, PLLD, VAC SENSORS & TANK <br /> GAUGE TO TANK INTERSTITIAL SENSOR LOCATION AND HOMERUN TO BLDG. PROVIDE <br /> L _ J SEAL–OFFS IN BUILDING & PRIOR TO LEAVING HAZARDOUS AREA. ROUTE TO INTRINSICALLY ^ <br /> SAFE TROUGH IN BUILDING. CONDUITS SHALL CONTAIN ONLY LOW VOLTAGE WIRING FOR 11 <br /> C SENSORS. ALL CONDUIT PENETRATIONS MUST BE MADE WITH ROBROY PVC COATED <br /> CONDUIT ONLY. <br /> er UJ M zo 01-1 D <br /> bi F__ PEA GRAVEL BACKFILL. ALL SUBSTITUTES MUST BE APPROVED BY MANUFACTURER AND <br /> SLIP ON RISER 42" I.D. m N OWNER'S FIELD REPRESENTATIVE. z Q <br /> Vn � MI <br /> FIELD SEALED JOINT. DW POLYGON BODY a <> PIPING SHALL BE LAID AND CONTINUOUSLY SUPPORTED ON A 6" COMPACTED PEA U J <br /> (ADHESIVE SUPPLIED L� J <br /> a GRAVEL BEDDING. PIPING SHALL NOT BE SUPPORTED BY BLOCKS, PLANKS, OR OTHER W <br /> W/ KIT) DEBRIS. ~ <br /> Q C/-) LL <br /> ALL ENTRIES TO BE PERPENDICULAR TO CONTAINMENT SUMP. OFFLINE INSTALLATION <br /> � <br /> NOT PERMITTED. <br /> 3/8 X 1/4 SS � CD <br /> BUSHING REAM ALL RISERS FOR FULL PIPE BORE IF REQUIRED. �w^ <br /> INSTALLED AT Q v J <br /> FACTORY 1 a, o INSTALL TANK ID MARKERS IN THE SPILL CONTAINMENT MANHOLES. COVERS SHALL BE L w <br /> PRIMED AND PAINTED ACCORDING TO SPECIFICATIONS. 0--) z _ <br /> FACTORY N SECONDARY CONTAINMENT IS REQUIRED FOR ALL VENT AND STAGE II VAPOR RECOVERY C) 0 Q <br /> PIPING . <br /> LAY–UP DW COLLAR __1 A -- %v I ::E <br /> BONDED TO COAT ALL BURIED GALVANIZED STEEL WITH COAL TAR EPDXY. consultant job# <br /> J_ TANK <br /> LAYOUT TANKS & STAGE II VAPOR RECOVERY PIPING SUCH THAT THE STAGE II PIPING <br /> — _ DRAINS & ENTERS INTO REGULAR UNLEADED TANK FIRST W/ 3" CONNECTIONS, AND master release date <br /> JOINT DETAILS — — 2 CONTINUES 3" TO OTHER TANKS. <br /> CONCRETE SHALL BE THICKENED AT THE THE FILL SUMPS DOWN TO BELOW THE TOP project master <br /> OCONTRACTOR TO ADDITIONALLY GLASS WRAP & LAMINATE AT CONNECTION FOLLOWING CURING OF 42" DIA. POLYGON SUMP BODY OF CONTAINMENT OF THE DOUBLE WALL SUMP AS REQUIRED. DIMENSION OF SLAB exe date drawn by <br /> ADHESIVE. SPECIFIC ATTENTION MUST BE GIVEN TO SURFACE PREP AS TESTING REQUIREMENTS (8) 17 3/8" FLAT PANELS THICKNESS VARIES WITH SITE CONDITIONS. <br /> WILL DETECT THE SMALLEST OF FLAWS. ALL MATERIALS MUST BE COMPATIBLE WITH GASOLINE, <br /> GASOLINE WITH 15% MTBE (METHYL TERTIARY–BUTYL ETHER), OR GASOLINE WITH 10% ETCH 1/4" DRAIN/TEST BUSHING. CROSSING FLEX CONNECTORS MUST MAINTAIN A MINIMUM OF 2 INCH CLEARANCE OR <br /> (ETHANOL). FIBERGLASS AND RESIN MUST EXTEND 1/2" BEYOND COVERAGE OF ADHESIVE. FACTORY INSTALLED THE USE OF AN ANTI CHAFING DEVICE MUST BE INSTALLED. NOTE: CONTRACTOR TO USE ADDITIONAL <br /> NOTE: GALVANIZED FITTINGS AS REQUIRED TO Facility/Project <br /> OTHE STRAP CHANNEL IF PRESENT ON THE FILL SIDE SUMP DOES NOT "COMMUNICATE" WITH CONTRACTOR SHALL BE HELD RESPONSIBLE MINIMIZE BENDS IN FLEXIBLE CONNECTORS <br /> 2 <br /> THE INSIDE OF THE SUMP. CONTRACTOR TO BE SURE TO LEAVE UNOBSTRUCTED PATH FOR FOR PROPER INSTALLATION & PREPARATION <br /> STRAP TO PENETRATE INTO THE CHANNEL SO THAT TANKS MAY BE PROPERLY ANCHORED. PER MANUFACTURERS INSTRUCTIONS AND sheet name <br /> SHALL REINSTALL SUMPS IF HYDROSTATIC <br /> F: TYPICAL DOUBLE WALL FILL SUMP TESTING SHOWS LEAKING IN THIS AREA OF M .5.3. 18 <br /> SCALE: 3/4" = 1'-0" THE SUMP. <br />
The URL can be used to link to this page
Your browser does not support the video tag.