My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
2023-2025 Reports
>
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 8:51:58 AM
Creation date
11/30/2023 9:10:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />Forward Landfill WMU FU-23 2 GEOSYNTHETIC CLAY LINER (GCL) <br />02777 <br />1.3 SUBMITTALS AND NOTIFICATIONS <br /> A. Prior to shipment of the GCL, the GEOSYNTHETICS CONTRACTOR shall provide the QA/QC CONSULTANT with a notarized certificate signed by an authorized representative of the Manufacturer stating that the product supplied meets the properties specified in this Section. <br /> B. Uncertified material that is installed shall be removed by the GEOSYNTHETICS CONTRACTOR at no cost to the OWNER. <br /> C. Testing specified in this Section shall be performed for this project by a laboratory approved by the QA/QC CONSULTANT. <br />1.4 CONSTRUCTION QUALITY ASSURANCE MONITORING <br /> A. The QA/QC CONSULTANT shall monitor installation as outlined in the CQA Manual. <br /> B. The GEOSYNTHETICS CONTRACTOR shall be aware of the activities outlined in the CQA Manual and account for these CQA activities in the installation schedule. <br />1.5 QUALIFICATIONS <br /> A. The GEOSYNTHETICS CONTRACTOR shall be experienced in the installation of GCLs. In the event the GEOSYNTHETICS CONTRACTOR is not experienced, a representative of the GCL Manufacturer shall be on site to train the GEOSYNTHETICS CONTRACTOR, at no additional cost to the OWNER. <br />1.6 PACKING AND SHIPPING <br /> A. Geosynthetic clay liners shall be supplied in rolls wrapped in liquid impermeable and opaque protective covers. <br /> B. Geosynthetic clay liners shall be marked or tagged with the following information: 1. manufacturer's name; 2. product identification; 3. lot number; 4. roll number; and 5. roll dimensions. <br /> C. Transportation of the prefabricated geosynthetic clay liner is the responsibility of the GEOSYNTHETICS CONTRACTOR. The GEOSYNTHETICS CONTRACTOR shall be liable for all damages to the materials incurred prior to and during transportation to the site.
The URL can be used to link to this page
Your browser does not support the video tag.