My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
2023-2025 Reports
>
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 8:51:58 AM
Creation date
11/30/2023 9:10:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />Forward Landfill WMU FU-23 7 GEOSYNTHETIC CLAY LINER (GCL) <br />02777 <br /> D. The QA/QC CONSULTANT will increase the frequency of sampling in the event that test results are negative. This additional testing shall be performed at the expense of the GEOSYNTHETICS CONTRACTOR. <br /> E. Any materials that are not certified by the Manufacturer in accordance with this section, or that has a hydraulic conductivity greater than that specified in this Section shall be rejected and replaced, at no additional cost to the OWNER. <br />3.3 SURFACE PREPARATION <br /> A. The EARTHWORK CONTRACTOR shall be responsible for preparing the supporting (subgrade) soil. <br /> B. The subgrade shall be prepared in accordance with Section 02300, EARTHWORK. <br /> C. The subgrade surface shall be proof rolled to identify soft zones, and eliminate irregularities, ruts, and abrupt changes in grade. Any unacceptable areas shall be repaired by the EARTHWORK CONTRACTOR, at no additional cost to the OWNER. <br />3.4 ANCHORAGE SYSTEM <br /> A. The anchor trench shall be excavated by the EARTHWORK CONTRACTOR prior to geosynthetic clay liner placement, to the lines and grades shown on the drawings. <br /> B. No loose soil shall be allowed in the anchor trench beneath the geosynthetics. <br /> C. The geosynthetic clay liner shall be anchored with compacted general earthfill, as identified on the drawings. <br /> D. Care shall be taken when backfilling the trenches to prevent any damage to the geosynthetic clay liner. <br />3.5 HANDLING AND PLACEMENT <br /> A. The GEOSYNTHETICS CONTRACTOR shall handle all geosynthetic clay liners in such a manner to prevent any damage. <br />B. Geosynthetic clay liners shall be cut using a utility blade in a manner approved by the QA/QC CONSULTANT. Any damage to any underlying liner system components during cutting will be repaired by the GEOSYNTHETICS CONTRACTOR, at no cost to the Owner. <br /> C. During placement, care shall be taken not to entrap stones or moisture under the geosynthetic clay liner. Care shall be taken not to walk on or drag equipment across the exposed geosynthetic clay liner. <br /> D. Any geosynthetic clay liner damaged by stones or other foreign objects, or by
The URL can be used to link to this page
Your browser does not support the video tag.