My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
2023-2025 Reports
>
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 8:51:58 AM
Creation date
11/30/2023 9:10:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />Forward Landfill WMU FU-23 8 GEOSYNTHETIC CLAY LINER (GCL) <br />02777 <br />installation activities, shall be replaced by the GEOSYNTHETICS CONTRACTOR at no additional cost to the OWNER. <br /> E. The geosynthetic clay liner shall not be installed on an excessively moist subgrade or on standing water. The geosynthetic clay liner shall be installed in a way that prevents hydration prior to completion of construction of the liner system. <br /> F. The geosynthetic clay liner shall not be installed during precipitation or other conditions that may cause hydration of the geosynthetic clay liner. <br /> G. The geosynthetic clay liner shall be installed as shown on the Construction Drawings, or as otherwise indicated by the Manufacturer, if approved by the QA/QC CONSULTANT. <br /> H. Geomembrane installation shall immediately follow the geosynthetic clay liner installation. All geosynthetic clay liner that is placed during a day's work shall be covered with geomembrane before the GEOSYNTHETICS CONTRACTOR leaves the site at the end of the day. <br /> I. Geomembrane shall not be placed on a geosynthetic clay liner that is hydrated. <br /> J. All geomembrane seams shall be welded after each geomembrane panel is placed over the geosynthetic clay liner. Heat sealing of seams for geomembrane placed over GCL alone is not acceptable. <br /> K. All geomembrane defects and destructive sample locations shall be immediately repaired. <br /> L. Operations layer soil overlying the liner system components shall immediately follow the installation of the geomembrane and other geosynthetics overlying the geosynthetic clay liner. If areas cannot be covered immediately due to steepness of slopes, visqueen shall be placed over geosynthetic components overlying the geosynthetic clay liner. The geosynthetic clay liner shall be removed and replaced if it becomes hydrated. <br /> M. All hydrated geosynthetic clay liner shall be removed and replaced by the GEOSYNTHETICS CONTRACTOR at no additional cost to the OWNER. Hydrated GCL is defined as material that has become soft as determined by squeezing the material with finger pressure, material that has exhibited swelling, or material that has a moisture content greater than 100 percent as determined by ASTM D2216 or ASTM D4643. Cause for replacement of the GCL due to exposure to moisture and subsequent hydration shall be determined at the QA/QC CONSULTANT’s sole discretion.
The URL can be used to link to this page
Your browser does not support the video tag.