My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
2023-2025 Reports
>
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 8:51:58 AM
Creation date
11/30/2023 9:10:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Forward Landfill WMU FU-23 <br />02778 3 HDPE GEOMEMBRANE <br />K. Panel: The unit area of geomembrane that will be seamed in the field. If the geomembrane is not fabricated into panels in a factory, a panel is identified as a roll or portion of a roll without any seams. 1.4 SUBMITTALS <br />A. Product Data: Submit the following to the QA/QC CONSULTANT. 1. Resin Data. a. Statement of production date or dates. b. Certification stating that the resin meets the product requirements (see Paragraph 2.2). c. Certification stating that all resin used in the production of the geomembrane are of the same type, and that reclaimed polymer is limited to 10 percent reworked material. d. Copy of quality control certificates issued by manufacturer. e. Test reports from manufacturer. 2. Geomembrane Rolls. a. Statement of production date or dates, and manufacturers certificates for each day's production. b. Laboratory test results and certification stating that the geomembrane meets the product requirements of Part 2. c. Certification stating that all geomembrane rolls are furnished by one supplier, and that all rolls are manufactured from one resin type obtained from one resin supplier. d. Copy of quality control certificates issued by manufacturer and including designation of test methods used. Also include roll numbers, batch numbers, lot numbers, and roll identification. e. Test reports from the manufacturer. f. Typical results of complete notched constant tensile load test for specified resin and sheet thickness. g. Statement certifying that no reclaimed polymer is added to the resin. h. Statement listing percentages of processing aids, antioxidants, and other additives other than carbon black added to or in the resin. B. Extrudate Beads and/or Rod. 1. Statement of production date or dates. 2. Laboratory certification stating that the extrudate meets the product requirements of Part 2. 3. Certification stating that all extrudate is manufactured by one manufacturer and resin is supplied from one supplier. 4. Copy of quality control certificates issued by manufacturer. 5. Test reports from the manufacturer. 6. Certification stating that the extrudate bead or rod resin is the same type, from the same manufacturer and compatible with the resin used to manufacture the geomembrane supplied for this project. <br />C. Schedules and Drawings. 1. Submit installation schedule 2 weeks prior to installation. Include hours to be worked per day, week, and shift. Indicate all weather delay built into schedule.
The URL can be used to link to this page
Your browser does not support the video tag.