My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
2023-2025 Reports
>
COMPLIANCE INFO_FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 8:51:58 AM
Creation date
11/30/2023 9:10:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
FINAL WMU FU-23 DESIGN RPT & CONCURRENCE LTRS
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Forward Landfill WMU FU-23 <br />02778 4 HDPE GEOMEMBRANE <br />2. Submit installation layout drawings 2 weeks prior to installation of geomembrane, submit drawings showing the panel layout indicating both fabricated (if applicable) and field seams, and details not conforming to the Contract Drawings. Upon acceptance, use these drawings for installation of geomembrane. <br />D. Field Quality Control Documents 1. Submit quality control documentation prepared during installation. Submit no later than 1 week following completion of work. 2. Submit daily prior to the start of installation, subgrade acceptance certificate signed by the installation supervisor for each area to be covered by the geomembrane. Allow QA/QC CONSULTANT time to inspect certified area. <br />E. Equipment: Submit the following 2 weeks prior to installation: 1. Equipment list stating quantity, types, model numbers, calibration certificates, and maintenance requirements. <br />F. Submit upon completion of the installation: 1. Certificate stating the liner has been installed in accordance with the plans and specifications. 2. The warranty obtained from the manufacturer/fabricator and the installation warranty. 3. As-built drawings showing locations of panels, seams, repairs, patches, and destructive samples, including measurements. 4. Copies of seam test results. <br />G. Submit a continuous length of each type of geomembrane measuring 50 feet by the roll width taken from certified and approved geomembrane rolls delivered to the Project site. The geomembrane samples submitted shall be labeled with the product identification, lot number, and roll number. 1.5 QUALIFICATIONS A. Master Welder Qualifications: Must have completed a minimum of 5,000,000 square feet of polyethylene geomembrane seaming work using the type of seaming apparatus proposed for use on this project. <br />B. Other Seamers Qualifications: All seamers must have seamed a minimum of 1,000,000 square feet of HDPE geomembrane. 1.6 QUALITY ASSURANCE <br />A. The OWNER will engage and pay for the services of a QA/QC CONSULTANT for monitoring the quality and installation of geomembrane material being installed unless otherwise specified. 1.7 DELIVERY, STORAGE, AND HANDLING <br />A. General: Conform to the manufacturer's requirements.
The URL can be used to link to this page
Your browser does not support the video tag.