Laserfiche WebLink
<br />APPENDIX A DAILY REPORT FORMS <br />(To Be Provided by the CQA Organization) <br /> <br />APPENDIX B EARTHWORK TESTING REPORT FORMS <br />(To Be Provided by the CQA Organization) <br /> <br />APPENDIX C GEOSYNTHETICS DOCUMENTATION FORMS <br />(To Be Provided by the CQA Organization) <br /> <br /> <br />NOTE: Forms referenced in the above appendices are not included in this manual. <br />Forms should be provided by the QA/QC Consultant selected by the Owner <br />to provide CQA services for this project. <br /> <br /> <br />TABLES <br /> <br />3-1 Granular Drainage Material Control Testing ..........................................................................12 <br />3-2 Coarse Gravel Material Control Testing ................................................................................12 <br />3-3 Clay Liner Acceptance Testing ...............................................................................................13 <br />3-4 Clay Earthfill Acceptance Testing ...........................................................................................14 <br />3-5 Granular Drainage Material Acceptance Testing ....................................................................15 <br />3-6 Coarse Gravel Acceptance Testing…………………………………………………………...15 <br />3-7 Protective Operations Layer Acceptance Testing ...................................................................15 <br />3-8 General Earthfill Material Acceptance Testing .......................................................................16 <br />ATTACHMENT A – LEAK LOCATION TESTING REQUIREMENTS