My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2023-2025
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
CORRESPONDENCE_2023-2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2026 2:27:17 PM
Creation date
12/15/2023 2:54:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2023-2025
RECORD_ID
PR0440058
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
17720 E HARNEY LN LODI 95240
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2023-2024 WINTERIZATION PLAN <br /> NORTH COUNTY LANDFILL <br /> For 2023-2024 winterization operations at North County Landfill (NC), the following <br /> existing winterization measures are in place: <br /> 1. Grading <br /> The top deck of Modules 1-4 have been graded to drain with 3% slope. Soil <br /> berms have been placed to channel storm water runoff to designated low spots <br /> or down drains (Figure 1). <br /> 2. Drainage Ditches <br /> a. The existing drainage ditches on the perimeter of Modules 1-4 will be used <br /> to direct storm water runoff into NC's storm water pond and the wetlands. <br /> b. The existing perimeter drainage ditch west of Module 1-5 will be used to <br /> direct most of the storm water north to the wetlands. <br /> 3. Down Drains <br /> The existing down drains on Modules 1-4 will be used to convey storm water to <br /> the existing perimeter drainage ditches (Figure 1). <br /> 4. Customer Haul Road <br /> The existing customer haul road from scale house to the disposal area is paved. <br /> 5. Erosion /Sedimentation Control <br /> The existing side slopes of Modules 1-4 have established vegetation to provide <br /> erosion and sediment control. <br /> WINTERIZATION TASKS <br /> Following tasks are complete or will be done as part of 2023-2024 winterization, <br /> completed by October 31 unless noted otherwise: <br /> NC winterization Plan Page 1 of 3 Printed 10/2/23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.