My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2023-2025
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
CORRESPONDENCE_2023-2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2026 2:27:17 PM
Creation date
12/15/2023 2:54:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2023-2025
RECORD_ID
PR0440058
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
17720 E HARNEY LN LODI 95240
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MODULE 1-4 <br /> 1. Drainage Ditches <br /> Existing drainage ditches will be inspected and cleaned of vegetation and debris. <br /> 2. Down Drains <br /> Existing down drains will be inspected and re-connected as needed. <br /> MODULE 5B-6 <br /> 1. Winter Pad <br /> A new winter pad has been constructed in Module 5B for refuse disposal during <br /> wet weather. The winter pad is constructed of recycled aggregate base and <br /> concrete rubble over compacted refuse. <br /> 2. Customer Haul Road <br /> The customer haul road from main paved access road has been extended to new <br /> winter pad (Figure 1). <br /> 3. Daily Cover Soil <br /> Daily cover soil has been stockpiled near the winter pad for winter operations. <br /> 4. Grading <br /> All finish grades of refuse lifts in Module 5B and 6 are graded with 2% slope to <br /> aid storm water runoff. <br /> 5. Drainage <br /> Soil berms will be installed along the downslope edges of Module 5B to control <br /> surface storm water runoff (Figure 1). Down drains will be installed at the end of <br /> the soil berms to convey storm water to the appropriate place. <br /> 6. Erosion/Sedimentation Control <br /> Mulch will be applied on side slopes of Module 5 and 6 (Photo land 2). <br /> NC winterization Plan Page 2 of 3 Printed 10/2/23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.