(EDIT AS NECESSARY) WWI <br /> TANK EXCAVAMON NOTE GROUND WATER LEVEL NOTE: <br /> TANK EXCAVATIONS SHALL BE PER OSHA REQUIREMENTS AND BE PERFORMED <br /> FOLLOWING THE RECOMMENDATIONS OF THE SOILS REPORT.TANKS A SOILS REPORT OF THIS SITE LOCATION HAS REVEALED THAT GROUNDWATER <br /> EXCAVATIONS THAT REQUIRE SHORING SHALL BE ENGINEERED AND PERMITTED WAS ENCOUNTERED BETWEEN XX.X AND XX.X FEET BELOW THE GROUND <br /> SEPARATELY AND SHALL BE THE RESPONSIBILITY OF THE INSTAWNG SURFACE WITH A MAXIMUM EXPLORED DEPTH OF X%.X FEET.TANKS SHALL <br /> CONTRACTOR.HIGH WATER TABLE IS ANTICIPATED.CONTRACTOR TO SHORE BE INSTALLED WITH CONCRETE DEADMEN AND FILTER FABRIC PER NORCAL CAJUN FOODS INC <br /> AND DEWATER TANK HOLE EXCAVATION.FOLLOW TALK MANUFACTURER'S MANUFACTURERS'GUIDEUNES. 2190 MERIDIAN PARK BLVD,STE G <br /> INSTALLATION INSTRUCTIONS FOR WET HOLE TANK INSTALLATION. CONCORD,CA 94520 <br /> MOM PH:(925)448�808 <br /> SOILS REPORT BY: <br /> COMPANY <br /> ADDRESS <br /> PHONE <br /> 7u ENGINEER <br /> Call Toll Frea REPORT FILE/AND DATE Np CONULTANP. <br /> (800)T2Wp27-2600(EDIT As NECESSARY) <br /> WORKING DAYS <br /> BEFORE YOU <br /> DIG <br /> -sM FUEL LINE LEGEND <br /> '' •• 87 UNLEADED <br /> �• �• �• �• �• 91 UNLEADED <br /> DIESEL <br /> / - NE(ttP.)V GROSS 0 vAPQRYP sB k N Rsn VAPOR RECOVERY <br /> ,l �LIJJ- V _ -/ __ _- — _ _��--L - CHASE <br /> -f — <br /> / J <br /> �-- - _ <br /> W ° FIL IrtM `rtM <br /> , <br /> , <br /> , <br /> c <br /> _ s <br /> —_ — <br /> 5 A RENO P!.1)' W <br /> O F w CH D y " <br /> R ROQF oAiNJ ttE7 VENT LINE <br /> IRK'" REOUIR.,EMEN�TS �_ W�`°W <br /> d <br /> -- �� GENERAL NOTES K30 Architects,Inc <br /> ------------° ss_ _ 2e DIA.GALV STEEL VENT <br /> 3090 Frte Cvcle#I 4 <br /> amentq CA 95 7 <br /> ✓ Ik �FRSWHRAPPED TO-GRADE, i -JL--- L--- PH(9]6)4SSfiSOO AAX:(9I6)4SS-B]OO <br /> / - -I INTI TO.MATCH SIZE CONDITIONS <br /> L A\/° I\ _ ) UTE(2)$PARNDUITS NOTE: <br /> I- - - °- -_ I INJRIN$ICAJ_LY 5 F MREWAY CONTRACTOR ASSUMES RESPONSIBILITY TO ASSURE THAT THE OPERABLE SYSTEM MEETS THE DESIGN INTENT AND THE CONTRACTOR <br /> __ �i I IS PERMITTED TO ADJUST PIPING LOCATIONS BASED ON ACTUAL FIELD CONDITIONS AND INSTALLATION TECHNIQUES. <br /> E OUN FUEL TA K "" •PRODUCT,VAPOR AND VENT PIPING IS TO SLOPE TOWARD TANK 1/8"PER FOOT MINIMUM,1/4"PER FOOT PREFERRED.IF <br /> v ° INSTALLED,SIPHON PIPING TO SLOPE 1/4"PER FOOT. <br /> / I I INTERSTITIAL MONITOR ` OVER RM STROBE D 7 V8C-BO 'SECONDARY CONTAINMENT PIPING IS SHOWN BY NOTE ONLY,NOT GRAPHICALLY.ALL PRODUCT PIPING TO BE DOUBLE CONTAINMENT <br /> NENTSPTYR. TANI LEVEL GfLGE(TYP.) QI ACKN E E SWITCH PIPE VENT AND VAPOR RECOVERY SHALL BE SINGLE WALL,UNLESS REWIRED BY LOCAL JURISDICTION. <br /> PAVING M. -- TANK AD ---- <br /> ______ _ 7 RFT. 9 I OO INSTALL DOUBLE WALL ERGLA55 TANKS WITH A`NI 005 MONITORING OF HYDROSTATIC ANNULAR SPACES BY"VEEDER ROOM TLB-450 PLUS TANK <br /> -- AND PIPING MO M SYSTEM.ALL TANK.SUMPS SHALL BE INDIVIDUALLY CONTINUOUSLY MONITORED BY"WED ER R00 E SORS <br /> 1 I �_�_�_": «-� ��. .�-�A• I ' TIED INTO THE TLS-460 PLUS ANK&PIPING MONITOR SYSTEM.TANKS TO BE SET MIN_60"BELOW FINISH GRADE.TANK INSTALLATION SHALL BE IN <br /> 1 B I . ACCORDANCE RER'S INSTALLATION INSTRUCTIONS <br /> c 11 C�° °' Y-' '7' I ♦ Q INSTALL A CONCRETE SLAB OVER TANKS.SURFACE WATER SHALL BE DIVERTED AWAY FROM EACH MANHOLE BY FORMING A CONCRETE CROWN WITH A BP MASTER DRAWNG RELEASE NUMBER <br /> I° 1-1/2"DROP IN 1B"FROM THE EDGE OF THE MANHOLE RING TO THE SURROUNDING SLAB ELEVATION CONSTRUCT SLAB PER CIVIL SLAB INSTALLATION <br /> DETAILS AND SPECIAL REQUIREMENTS SHOWN ON DETAILS. COXX V-13.0 JUNE 10,2016 <br /> FYI03 NOT USED 110. DAZE REMSON 06CRIPTON <br /> (j)NOT USED Q1 eroe/Te ruN wEacWkJlrs <br /> 05 INSTALL VARIABLE SPEED TURBINES IN UNDERGROUND STORAGE TANKS.CONFIGURE TURBINES AS SHOWN ON DETAILS.TURBINE SYSTEMS TO BE EQUIPPED Q wo. RAN w¢x.00/ <br /> . R. DD's* Ei • " WWITH 3 GPH ELECTRONIC LINE LEAK DETECTION.LEAK DETECTORS ARE TO BE TESTED FOR THE 3 GPH LEAK DETECTION PRIOR TO START UP. <br /> CONTRACTOR TO PROVIDE TEST DATA AT THE TIME OF PUNCH LIST AS WELL AS INCLUDE IN CLOSE OUT BINDER.SET TURBINE INTAKES AT 5"FROM VIM ru¢BAX w¢x¢NNgrs <br /> K:� °Y= v Y•�� 4. 1 I I BOTTOM OF TANKS.TURBINES TO BE EQUIPPED WITH INTAKE FILTER SCREENS CONTRACTOR IS TO LABEL TURBINES AND CONTROLLERS AS TO WHICH 3Q <br /> o D. 4 < I • _/°f` PRODUCT THEY SERVE GREEN CONTROLLER LIGHTS ARE TO GO OUT WHEN TURBINES ARE OFF OR LOSE POWER. qQ 1ynre ru¢RNI wra-wwm s <br /> • 1 °I � °. ... ° j ] ' i �' i - � Hrona N¢R.rlwr�mluq,: <br /> g ©IF REQUIRED BY LOCAL AUTHORITY HAVING JURISDICTION INSTALL 3"FIBERGIASS STAGE II VAPOR RECOVERY HEADER FOR VAPOR RECOVERY SYSTEM. <br /> _v 30 X46"EI.Ej.R ' 3p"X48'fAEAR I • I / < C j SLOPE 1/g"PER FOOT MINIMUM TO TANKS.INSTALL 3"TO 2"REDUCING TEES WHERE HEADERS BRANCH TO DISPENSERS.CONTRACTOR TO INSTALL BQ eroory ru¢fU4 arw uNNgrs <br /> FL00R-OR FLOOR OR I I ' / / TRACER TAPE W1TH VAPOR PIPING.TESTNG OF VAPOR LINES SHALL BE PERFORMED PRIOR TO BACKFILL,PRIOR TO PAVING AND BEFORE STATION <br /> IIICCCROUND'SP4CE' - - GROUND EPXgE o' : / ° / OPERATION SECONDARY CONTAINMENT TO BE INSTALLED WHEN REQUIRED BY LOCAL JURISDICTION ONLY.SEE DETAILS AND SCOPE OF WORK ON SHEETS B T/3/ ru¢RSX ara mwwm s <br /> FS0.1&ES0.2 FOR PIPE SIZING AT UNDERGRWND STORAGE TANKS. <br /> ( I INS TALL EMERGENCY PUMP 5O'a ' X 1Z3� CANOPY W Ds I / / ' `' E <br /> SHUTOFF SWITCH AND _ ___ __ _______ ____ __ _° __ 1 / �� Q INSTALL 2"INSIDE 3"DOUBLE WALL FIBERGLASS GASOLINE SUPPLY LINES TO DISPENSERS PIPING SHALL BE INSTALLED PER MANUFACTURER'S <br /> I I WEATHER PROOF OUTLET PER BLENDING 3 PRODUCT -J I SPECIFICATIONS AND INSTRUCTIONS.PIPING SHALL BE INSTALLED WITH A MINIMUM SLOPE OF 1/8"PER FOOT FROM THE FURTHEST DISPENSER SUMP DOWN Al <br /> ZL <br /> HIRE CODE REQUIREMENTS LOCATION OF FIRE O / TO THE TURBINE SUMPS CONTRACTOR TO INSTALL TRACER TAPE WITH PRODUCT PIPING.TESTING OF PRODUCT LINES SHALL BE PERFORMED PRIOR TO <br /> ( I MPD(ttP.SINGLE EXTINGUISHER IN SURFACE O / / <br /> I LOCATION OF FIRE HOSE PER SIDE.ttP) MOUNTED CABINET.MUST BE / / BACKFILL,PRIOR TO PAVING AND BEFORE STATION OPERATION. <br /> P <br /> OR <br /> IN SURFACE NEW ASPHALT µ'ITHIM 75'OF ALL DISPENSERS I I V <br /> 1 I (IOUNTED CABINET.MUST BE ISLAND BUMPER POST PAVING,TYP. AND FILLS FIRE EXTNGUISHER 1 I J / OO INSTALL"VEEDER ROOM TANK AND UNE ALARM CONTROL PANEL MODEL 1L5- 0 PWS IN BUILDING AT NORMALLY OCCUPIED LOCATION IN BUILDING. gAM <br /> I THIN 75'OP ALL DISPENSERS (TYP.B PLCS.) SHALL BE 2A:10-B:C RATED. CO / SEE ARCHITECTURAL AND ELECTRICAL DRAWINGS FOR EXACT LOCATION. <br /> 1 -AND FILLS. FIRE EXTINGUISHER I D AR <br /> I I SHALL BE 2A:10-B:C RATED. ♦ I / 09 INSTALL A SINGLE 2"FRP VENT LINE FOR EACH UNDERGROUND STORAGE TANK.SLOPE 1/4"PER FOOT(1/8"PER FOOT MINIMUMI TO TANKS AS SHOWN. <br /> [I I 1 / A <br /> CONTRACTOR TO INSTALL TRACER TAPE WITH VENT PIPING.SECONDARY CONTAINMENT TO BE INSTALLED WHEN REQUIRED BY LOC L JURISDICTION ONLY <br /> ( I I• ----- --- ---- -- -- --- ---- ----- / - 10 TERMINATION THAT CAN BE BUILT UPON.VENT RISERS SHALL BE INSTALLED POINT OF TANK VENTS TO BE A MINIMUM OF 12'ABOVE GRADE AND NOT WITHIN 5'FROM ANY BUILDING OPENING OR PROPERTY LINE <br /> 1 -I - IN ACCORDANCE WITH UNIFORM FIRE CODE REQUIREMENTS.INSTALL TWO(2)SPARE rtr <br /> 1"CONDUITS W/PULL ROPE FROM GASOLINE VENT RISER TO BUILDING FOR FUTURE TANK DIAGNOSTIC REQUIREMENTS.VERIFY LOCAL REGULATIONS 1 29 <br /> _ FOR ADDITIONAL EQUIPMENT FI INSTALLATION REQUIREMENTS. <br /> 1 y \ <br /> W ZOIC2 <br /> 70 INSTALL A SINGLE 1"RIGID GALVANIZED CONDUIT FOR EACH NEWLY INSTALLED TURBINE PUMP. <br /> I[I _ <br /> 12 ANDA SUMPS L BOAT TANK ANNULAR SPACE HYDROSTATIC MONITORING SENSORS.SEE DETAILS FOR CONDUIT LOOPING BETWEEN ANNULAR RISER pF CDL\FD <br /> ( I -(d 73 INSTALL VALVE EXTRACTOR ASSEMBLIES FOR VENT,STAGE I AND STAGE II VAPOR RECOVERY AT FILL SIDE SUMP.VERIFY MTI LOCAL JURISDICTION <br /> I 4 FOR ALTERNATE REQUIRED LOCATIONS <br /> 0 INSTALL.1 GEN MAG PROBE TANK LEVEL GAUGES AT FILL SUMPS AS SHOWN <br /> 75 TANKS SHALL BE PROPERLY MARKED AND TAGGED WITH STANDARD API IDENTIFICATION MARKINGS AT FILL MANHOLES. j <br /> 1 / En F�/j ° a <br /> I N&AD WAYNE DIATOM SERIES,SINGLE HOSE PER SIDE,MULT-PRODUCT DISPENSERS AND 3 1(DIESEL)MPU'.AS SHOWN.DISPENSERS TO BE <br /> FITTED WITH STAGE II HOSES,NOZZLES AND BREAKAWAY VALVES PER LOCAL REQUIREMENTS.CONTRACTOR IS RESPONSIBLE FOR INSTAWNG HOSES, <br /> / NOZZLES AND BREAKAWAYS.INSTALL UNDER DISPENSER CONTAINMENT INCLUDING PRODUCT AND VAPOR SHEAR VALVES AND MONITORING SENSORS. <br /> EI "V- I' START UP BY MANUFACTURER REPRESENTATIVE.GENERAL COE TO IMPROPER INSTALLATION OR NTRACTOR TO PURGE LINES WITH A MINIMUM OF 200 GALLONS THROUGH EACH <br /> - <br /> ' =J "" HOSE/NOZZLE.ANY AIR POCKEOR START UP PROBLEMS DUINCORRECT MRING THAT DESTROYS ELECTRONICS ARCO TS YPLL BE BILLED BACK TO THE CONTRACTOR.AFTER PURGING THE PRODUCT LINES OF AIR AND BEFORE VAPOR RECOVERY TESTING,CONTRACTOR IS <br /> ✓ s "I \±Y" TO REPLACE THE FACTORY INSTALLED GASOLINE FILTERS WITH NEW FILTERS Y <br /> AM/PM <br /> / . C / °O� °°II ♦ _- D FILL AND STAGE I VAPOR RECOVERY RISERS&ANNULAR RISER SHALL BE GROUNDED TO PREVENT STATIC DISCHARGE DURING FILLING OPERATIONS.SEE <br /> 7 77 <br /> _ DW11 F51.3 FOR STANDARD DETAILS OR FS1.3 FOR OPTION WITH DOUBLE WALL SUMPS, P <br /> 79 ALL NEW PIPING AND TANKS TO BE INSTALLED PER MANUFACTURERS RECOMMENDATIONS AND INSTALLATION INSTRUCTIONS. N <br /> - 8 ° w <br /> S + C °�^O 2D INSTALL OVERFILL ALARM&ACKNOWLEDGMENT SMTCH,ESO AND MAINTENANCE RECEPTACLE IN LOCATION SHOWN.ALARIA AND SMTCH TO BE LOCATED <br /> TO PROVIDE Q UNVBSTRUCTED VIEW TO TRUCK DRIVER.PROVIDE BOLLARD PROTECTION OF FREE STANDING POLE SEE WIRING DIAGRAM AND DETAIL FOR O <br /> / 1 _✓ ° MOUNTING REQUIREMENTS. <br /> \ / - 2Q FL INAFACILITY EQUIPMENT LOCATIONS TO BE APPROVED BY DISTRIBUTION TERMINAL MANAGER PRIOR TO SUBMITTAL FOR PERMITS TO ENSURE CLEAR <br /> SAFE ACCESS TO THE UNDERGROUND TANKS FOR UNLOADING OPERATIONS. � <br /> " __ _ _ vEWER RooT LARM I i f GENERAL 6 <br /> COMPLIANCE NOTES <br /> yy,, Em 1 <br /> ELEVATIONS ARCHITECTURAL ANDND 'AEQUIPMENT LOCATIONSNGS �L TAKE PRECEDENCE FOR REFERENCING ALL DIMENSIONS,PROPERTY LINES, 9h AOORE�. <br /> I I 1 S URGO SM AND r + r W+ y ALL DIMENSIONS ANO COCDATODSTSHALL AE CNECNW ANDE OWED IENTMNEFIELD BEFORE STARNBEFORE APOR PROCEEDING WITH <br /> 2 <br /> N <br /> REP CY H BE LLE 0 THE ATTENTION OF H ERS ENGINEER FOR HIS DECISION 0 D G N <br /> &0 D I , I ' R , , , THE WORK. <br /> 3.GENERAL CONTRACTOR SHALL OBTAIN NECESSARY PERMIT FROM APPUCABLE AGENCIES FOR EXCA ATONS OF TRENCHES V-O" WEST EIGHT MILE ROAD& \ <br /> YOR MORE IN DEPTH INTO MACH A PERSON IS REQUIRED TO DESCEND. THRONTON ROAD <br /> PO I I ' 4.AN UNAUTHORIZED RELEASE RESPONSE PLAN MUST BE SUBMITTED AND APPROVED BY GOVERNING AGENCY PRIOR TO TANK STOCKTON,CA 95209 <br /> ® OPERATIONS. E <br /> 5.ALL MATERIALS SHALL BE COMPATIBLE MTH USE FOR THE INIENDW PURPOSE AS PER NATIONALLY RECOGNIZW CODES LOCAL `5 <br /> G CODES AND GOVERNING AUTHORITIES, MGIED BY: CE <br /> ® 6.THE UNDERGROUND STORAGE TANK SYSTEM SHALL BE COMPATIBLE WITH THE PRODUCT STORED. Opt®gy. <br /> - o].ALL MONITORING DEVICES SHALL BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS. <br /> y' 4 LL Jam- &GENERAL CONTRACTOR IS REQUIRED TO PROVIDE 72 HOUR(TYPICAL)NOTIFICATION TO GOVERNING AGENCY PRIOR TO TANK BV O <br /> - INSTALI1.TON. "I V-13.0—Not LL <br /> 9.TANK AND PIPING SYSTEM TO BE INSPECTED BY OWNER'S THIRD PARTY INSPECTIX2&GOVERNING AGENCY AT FOUR(4) 03/14/2018 18-003 0/ <br /> SEPARATE CONSTRUCTION PHASES(SEE SPECIFICATIONS): V <br /> A.TANK AIR TEST BEFORE SETTING IN HOLE AND SOAP TEST. MA04G TTP <br /> S TANKS AND PRIMARY PIPING HYDROSTATICALLY OR PNEUMATICALLY TESTED FOR 30 MINUTES. M <br /> UNDERGROUND TANK AND PIPING <br /> INSPECTION of ALL IDcoNES. CONTAINMENT,INcwolryc TEsnNc,IN ACCORDANCE WITH / <br /> II MANUFACTURER'S GUIDELINES SITE PLAN <br /> I D.FINAL INSPECTION INCLUDING ALL PORTIONS OF THE LEAK DETECTION SYSTEM. s <br /> 10.ALL TANK SUMPS AND UNDER DISPENSER CONTAINMENT SUMPS SHALL BE HYDROSTATICALLY TESTED(LAKE TEST)MTH 0 <br /> STANDING WATER TO TOP OF REDUCING COLLAR FOR A PERIOD OF 24 HOURS TO INURE THAT THE SUMPS ARE WATERTIGHT. 6 <br /> RECORD THE TEST RESULTS AND SUBMIT TO OWNER. <br /> It.TANKSYSTEM,LEAK DETECTORS AND MONITORING SYSTEM INTEGRITY TESTS FORWARDED AND APPROVED BY GOVERNING WEFT O <br /> AGENCY PRIOR TO TANK SYSTEM BEING PLACED IN OPERATION. <br /> /^1 Z <br /> 12.PRIOR TO FUEL BEING PUMPED,STATON MUST HAVE WEDER ROOT FUNCTONAL AND MONITORING ANNULAR SPACES OF TANK U <br /> AND DISPENSER SUMPS. �� ,0 0 <br /> 73.PAYMENT OF ALL APPLICABLE UST OPERATING FEES SHALL BE SUBMITTED TO THE GOVERNING JURISDICTION <br /> MTIH 30 DAYS OF THE FINAL INSPECTION. <br /> FUEL SYSTEM SITE PLAN 14.EVIDENCE OF FINANCIAL RESPONSIBILITY SHALL BE SUBMITTED TO GOVERNING AGENCY(BY BP). j <br /> MEASUREMENTS OF BRINE LEVELS IN TANKS SHALL BE TAKEN BY BP REPRESENTATIVE DURING THREE SEPARATE VISITS TO SITE <br /> SCALE: 1116"=1'.0" AND PRIOR TO FUELING OPERATIONS REFER TO TANK MANUFACTURER'S INSTALLATION INSTRUCTIONS FOR REQUIREMENTS. 6 <br /> 4 <br />