Laserfiche WebLink
Vapor Recovery <br />OPW <br />Ball Float <br />Tube Cut <br />per Local <br />Ff11 Riser <br />14" Minimum <br />Clearance For <br />Float <br />�— Align Float Along Length of Tb nk , « <br />Figue 34 <br />aptorbe- <br />n lack <br />eiv belts <br />S <br />P <br />A <br />FORi'f5'CABLEMOOEt.5oNLYc Che<kins�llation <br />again as done in Step 23 to ensure poppet actuates and <br />resets properly, See page 17 for full testing derails_ Ap <br />PIy pipe dope to the socket adaptor threads. Pipe dope <br />should be a norrhardening gasoline resi5tarrt pipe <br />thread seal compound. Install socket adaptor and <br />torque to 3,5 ftabs (42 in -its) minimum to S.o ft4bs (60 <br />In Ibsl maximum. After installing socket adaptor where <br />required, pressure test testable overfill valve per GARB <br />20). 1 D to ensure valve is vapor tight <br />75 <br />