Laserfiche WebLink
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for Sunwest Chevron as of January 09, 2024. <br /> Open violations from October 17, 2023 inspection <br /> Violation#301 -Failure to operate UST system to prevent unauthorized releases including leaks,spills and <br /> overfills. <br /> OBSERVATION: Per work order#16693 approximately 2 cups of"pink"brine was added to the diesel STP annular. <br /> The manufacturer of the diesel tank is Containment Solutions, Inc. (CSI)and contains green/blue colored brine. <br /> REGULATION GUIDANCE: The underground storage tank system shall be operated to prevent unauthorized <br /> releases, including spills and overfills. <br /> CORRECTIVE ACTION: Immediately verify the manufacturer of the brine that has been added to the diesel tank. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#302-Leak detection equipment not installed/maintained/located to detect leaks at earliest <br /> opportunity. <br /> OBSERVATION: Upon arrival the S17 vacuum sensor was found to be in alarm and actions have not been taken to <br /> address the alarm. <br /> REGULATION GUIDANCE:All monitoring equipment shall be maintained to be able to detect a leak at the earliest <br /> possible opportunity. <br /> CORRECTIVE ACTION: Immediately contact a properly licensed,trained, and certified contractor to address the <br /> alarm under permit and inspection of the EHD. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Violation#304-Failure to construct,operate,and maintain primary containment as product-tight. <br /> OBSERVATION: Liquid was observed in UDC 5/6, 7/8, 11/12, & 13/14, indicating a leak in the primary containment. <br /> REGULATION GUIDANCE:All primary containment for the UST system must be product tight. <br /> CORRECTIVE ACTION: Immediately have a properly licensed,trained, and certified contractor repair or replace the <br /> failed component(s), under permit and inspection of the EHD if necessary. <br /> Page 5 of 6 <br />