My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_POST CLOSURE LAND USE PROPOSAL 2014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SANTA FE
>
0
>
4400 - Solid Waste Program
>
PR0504909
>
ARCHIVED REPORTS_POST CLOSURE LAND USE PROPOSAL 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2024 9:41:24 AM
Creation date
2/27/2024 8:46:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
POST CLOSURE LAND USE PROPOSAL 2014
RECORD_ID
PR0504909
PE
4430
FACILITY_ID
FA0006400
FACILITY_NAME
RIVERBANK CITY DUMP
STREET_NUMBER
0
STREET_NAME
SANTA FE
STREET_TYPE
RD
City
RIVERBANK
Zip
95367
CURRENT_STATUS
01
SITE_LOCATION
SANTA FE RD
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
County of Riverside <br /> Grass associated with the solar arrays will be controlled by periodic mowing beneath the solar <br /> arrays. Arrays will be best maintained by using a manual weed trimming type of device that <br /> allows selective grass removal in planter areas and near the support footings of the solar arrays. <br /> Annual mowing in early summer after plants turn brown will be coordinated with the County and <br /> implemented at minimum. <br /> 9. 3 DRAINAGE SYSTEM <br /> 27 CCR 21090(b)(3), 20365, and 21150 <br /> A supplemental maintenance program will be implemented by SEI, and verified by the County, <br /> to maintain the integrity and effectiveness of the final drainage system in accordance with the <br /> post-closure maintenance plan and RWQCB Order No. 98-99-02. The final drainage system will <br /> be inspected and evaluated on an ongoing basis for: <br /> • Evidence of erosion <br /> • Standing water <br /> • Formation of gullies <br /> • Settlement, blockage, and damage to drainage channels, structures, swales, and <br /> culverts <br /> Damage to the drainage system will be promptly addressed under direction and to the satisfaction <br /> of the County. Cause(s) for the damage will be reported in writing in the record of maintenance <br /> activities prepared by SEI and submitted to the County per Section 9.2.1. <br /> Permanent repairs and restoration will be made consistent with final closure construction <br /> specifications. Temporary repairs may be utilized until permanent repairs can be scheduled. <br /> Culverts and inlet and outlet structures will be cleaned of sediment regularly before their flow <br /> capacities are impaired. Drainage inlet grates will be kept free of debris, and drainage channels <br /> will be maintained to permit free flow. Maintenance & methodologies for repairs and restoration <br /> will be consistent with the final cover and drainage system construction specifications. Cause(s) <br /> for the damage will be reported in writing in the record of maintenance activities prepared by <br /> Stronghold and submitted to the County and regulatory agencies. <br /> Results of the inspection and summary of maintenance performed will be compiled by SEI and <br /> included in the monthly monitoring report following the inspection. <br /> 9.4 LANDFILL GAS MONITORING AND CONTROL SYSTEMS <br /> 27 CCR 20921 et seq. and 21180 (a)(2) <br /> The LFG migration monitoring system will be inspected on an ongoing basis, consistent with the <br /> requirements and 27 CCR 20933. System components will be repaired and replaced as required <br /> to maintain full system capabilities, as intended at initial installation. <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.