My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_POST CLOSURE LAND USE PROPOSAL 2014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SANTA FE
>
0
>
4400 - Solid Waste Program
>
PR0504909
>
ARCHIVED REPORTS_POST CLOSURE LAND USE PROPOSAL 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2024 9:41:24 AM
Creation date
2/27/2024 8:46:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
POST CLOSURE LAND USE PROPOSAL 2014
RECORD_ID
PR0504909
PE
4430
FACILITY_ID
FA0006400
FACILITY_NAME
RIVERBANK CITY DUMP
STREET_NUMBER
0
STREET_NAME
SANTA FE
STREET_TYPE
RD
City
RIVERBANK
Zip
95367
CURRENT_STATUS
01
SITE_LOCATION
SANTA FE RD
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
County of Riverside <br /> The gas monitoring system inspection and maintenance program will be the responsibility of the <br /> County for the duration of the maintenance period, or until an operating exemption is granted by <br /> the CalRecycle and the LEA as allowed per 27 CCR 20921 (d). <br /> 9.5 EMERGENCY RESPONSE <br /> 9.5. 1 Earthquakes <br /> The West Riverside Landfill is located in an area of moderate to strong seismic activity. Ground <br /> motion resulting from faults in the region is expected to be moderate to strong. The landfill final <br /> grades and cover system have been designed based on a seismic slope stability analysis specific <br /> to site conditions and anticipated ground motion. Final cover system and solar equipment are <br /> expected to be stable under anticipated seismic conditions. <br /> The solar arrays will be visually inspected within 12 hours after a moderate or strong earthquake <br /> event. The inspection will assess the condition of final cover on the side slopes, benches and top <br /> deck; and drainage structures. Areas where the cover layer appears compromised, or refuse has <br /> day-lighted, will be identified. <br /> Necessary landfill repairs will be prioritized in accordance with other earthquake response needs <br /> at the landfill. Corrective landfill repairs will generally be made as described in Section 9.2 of <br /> this Maintenance Plan. If necessary, a remediation plan and/or corrective action construction <br /> plans and specifications will be prepared. Materials and application methodologies shall be <br /> subject to County and regulatory agency approval prior to implementation. <br /> 9.5.2 Floods <br /> The closed landfill cells lie at an elevation that is not within the 100-year flood plain as depicted <br /> in the Federal Emergency Management Agency flood insurance map for the region. No flood <br /> hazard is anticipated. <br /> 9.5.3 Geotechnical and Seismic <br /> The areas where the solar arrays are located are flat with minimum slopes. The solar project <br /> structures have been designed to withstand the anticipated seismic events at the site. A <br /> geotechnical report prepared for the solar project (GPI, 2014) is presented in Appendix C. A <br /> detailed cover and global seismic analysis is contained in the 1993 Closure and Post-Closure <br /> Maintenance Plan (The Earth Technology Corporation, 1993). <br /> 9.5.4 Surface Drainage Problems <br /> The existing surface water drainage system will handle runoff from the site with only minor <br /> instances of erosion expected. The system has been designed for 100-year rainfall event, which <br /> will provide adequate protection for the landfill. Routine monthly inspections and corrective <br /> landfill repairs will be made as described in Section 9.3 of this Maintenance Program. Drainage <br /> structure improvements and/or repairs will be implemented annually prior to the start of the rainy <br /> 1i <br />
The URL can be used to link to this page
Your browser does not support the video tag.