Laserfiche WebLink
SANJ O A Q U I N Environmental Health Department <br /> COUNTY <br /> 4 . Monitoring system functionality : Functionality of the monitoring system , including all sensors , <br /> must be verified to ensure monitoring has been restored to meet the requirements of CCR Title <br /> 23 and California Health & Safety Code ( HSC ) Chapter 6 . 7 . If a cold start of the monitoring panel <br /> is performed , a copy of the alarm history shall be printed prior to performing the cold start , and <br /> made available at the time of EHD inspection . (already completed 11/14/2023) <br /> 5 . Since concrete will be broken near the diesel tank , a secondary containment test must be <br /> performed on the diesel tank once concrete is poured in accordance with the manufacturer' s <br /> guidelines . <br /> The facility cannot receive fuel in the diesel tank prior to the EHD inspection and approval . <br /> 6 . Any individual installing underground storage systems or components must possess , or work <br /> under the direct and personal supervision of an individual physically present at the work site at <br /> all times while work is being performed who possesses , all of the following : <br /> • One of several permissible valid , current contractor licenses issued by the Contractors State <br /> License Board ( CSLB) <br /> • A current UST Installation/ Retrofitting certificate issued by the International Code Council <br /> ( ICC ) <br /> • A valid , current certificate of training from the manufacturer( s) of the component (s) being <br /> installed <br /> 7 . Any individual performing the work of a service technician must possess , or work under the direct <br /> and personal supervision of an individual physically present at the work site at all times while <br /> work is being performed who possesses , all of the following : <br /> • One of several permissible valid , current contractor licenses issued by the CSLB <br /> • A current California UST Service Technician certificate issued by the ICC <br /> • A valid , current certificate of training from the manufacturer(s ) of the component (s) being <br /> tested , or the developer of the testing equipment or test method (s) being used <br /> 8 . Individuals working under the direct supervision of a qualified UST installer or UST service <br /> technician must , at a minimum , be employed by the person with the CSLB license and possess <br /> all manufacturer certificates of training for the equipment on which they are working . <br /> 9 . The tank owner or operator shall log into the California Environmental Reporting System <br /> ( CERS ) at http : //cers . calepa . ca . gov/ and ensure all UST information is current . <br /> 10 . This permit expires 180 days from the date of approval . If an extension to the expiration date is <br /> required , a written request must be submitted to this office prior to the expiration date . <br /> If you have any further questions , please contact Carol Presto at ( 209) 616- 3061 or email <br /> ust ( sigov . org . <br /> Thank you , <br /> Carol Presto <br /> Registered Environmental Health Specialist <br /> Cc: Monica Farhat, mfarhat(cD.boVett. net, Boyett Petroleum Corporate Office <br /> 2 of 2 <br />