My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2013-2014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
CORRESPONDENCE_2013-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2024 1:22:51 PM
Creation date
3/18/2024 12:06:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2013-2014
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J <br /> 2 = EDMUND G.BROWN JR. <br /> GOVERNOR <br /> C wLIPOWXIA MATTHEW RODRIOUEZ <br /> Water®tel M l�1p r SECRETARY FOR <br /> aOK1 S ENVIRONMENTAL PROTECTION <br /> Central Valley Regional Water Quality Control Board RECEIVED <br /> 2 September 2014 <br /> SEP 0 4 2014 <br /> Kevin Basso— General ManagerVIIE T LH LTH <br /> Republic Services Inc. IT/ VICES <br /> 1145 West Charger Way <br /> Stockton, CA 95260 <br /> DESIGN REPORT REVIEW, FORWARD LANDFILL, SAN JOAQUIN COUNTY <br /> Central Valley Regional Water Board staff reviewed the Design Report, Compost Facility, Storm <br /> Water Improvements, Forward Landfill, submitted on 22 July 2014. The report presents grading <br /> plans, surface drainage, retention basin design, material and construction specifications, and <br /> construction quality assurance procedures for improvements to the existing Compost Facility at <br /> Forward Landfill. <br /> The Design Report is in general compliance with Waste Discharge Requirements Order R5- <br /> 2014-0006 and State Board's "Draft General Waste Discharge Requirements for Composting <br /> Operations". The following items should be included in the final Construction Quality Assurance <br /> (CQA) report: <br /> 1. Sufficient information for Water Board staff to determine that the unit was constructed in <br /> compliance with this Design Report, Title 27 and Waste Discharge Requirements. <br /> 2. As-Built Drawings of the major components. <br /> 3. Daily, weekly and other construction reports and change orders should be documented in <br /> the final CQA Report (Copies of weekly construction reports should be sent by email to <br /> Water Board staff each week.) <br /> Staff concurs with the design plans and specifications and believes that they comply with Title <br /> 27, the facility WDRs, and Draft General Waste Discharge Requirements for Composting <br /> Operations. Please contact me at (916) 464-4614 with questions. <br /> `--e. )/01_� <br /> Ross Atkinson <br /> Engineering Geologist <br /> Title 27 Permitting and Mining Unit <br /> cc: Robert McCellon, San Joaquin County LEA, Stockton <br /> Sangeeta Lewis, Lewis Engineering, Erin Fanning, Republic Service, Manteca <br /> KARL E. LONGLEY Sc D, P.E., CHAIR I PAMELA C. CREEDON P.E., BCEE, EXECUTIVE OFFICER <br /> 11020 Sun Center Drive#200,Rancho Cordova,CA 95670 1 www.waterboards.ca.gov/centralval ley <br /> ��RECYCLED PAPER <br />
The URL can be used to link to this page
Your browser does not support the video tag.