My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2026 2:28:04 PM
Creation date
3/28/2024 2:04:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0506488
PE
2361 - UST FACILITY
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190A
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4943 S STATE ROUTE 99 STOCKTON 95215
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TIS4TOOt,.CI[PROCEDUREIIIIELO W, <br /> FOR 71 50-TOOL,SEE PAGE 8 71 S0-TOO LCT <br /> FOR 71 SO-TOOM SEE PAGE 9 <br /> STEP 9C. INSERT 7150-TOOLCT OVER MET TUBE <br /> To in"I the 7150-TOOLCT(soki separat+efy)over the <br /> inlet tube,fist loosen The thumb scrEws,so the tool can <br /> pass freely over the Inlet tube flange. Align the slot on <br /> the tool with the heir on the I n let tube and insert the <br /> tool down. Sr Figuuro 9C. Tip to stop dimen slon must <br /> be 1-3/16'to 1-1/4' <br /> Loosen F I I C <br /> thumb Hand tighten STEP 12C: DRILL HOLES <br /> screws Tool SIaT thumb screws With the inlet tube and/150-TOOL-CT in place,carefully <br /> - drill a 3/16'diameter hole In the upper tube using the <br /> We in the 71 SO-TOOLUas a guide. The drill step is <br /> s postwred so it will bottom out agair►si the tool after <br /> +._ ��7 �. i tbPbithasdrilledthroughtheupperdroptube. Ifthe <br /> J, ;r L I t �- stop is posi coned wrong either no hale wil be drilled, <br /> } or a through hole could potermaily be drbled through <br /> _ the inlet tube. If no hole is d ri lled retum to step 11 C <br /> "•, �� and cfwck the stop dimension. If a hole is drilled <br /> through the Intel tube or into the strew Note the assem <br /> bly is not salvageable. Drill(2)mate holes in ttre two <br /> remaining guide holes. <br /> i <br /> Tube I <br /> Key <br /> Fr uyv 9C FfgurQ?OC AT-q <br /> STEP 14C: TIIGHTFH THE 71SO-TOOLCT <br /> Enwm that the too!sears flat against the tap of the inlet <br /> tube. To prewrit verikal movement of the tool during p 9, „bea h, <br /> drilling,hand tighten the thumb screws against the up- <br /> per drop tube. See Figure l OC. <br /> STEP i iC- PREPARE DRILL ARD Off <br /> Confirm that the snap on the 3/1 a drill bit supplied Figum 1'2C <br /> wi th the 71 SO-TOQLC f 7 s in i he co rrect position before <br /> drilling. The stop is factory instalied at a distance be- <br /> tween 1.3176"to 1-1/4'born the tip with the 71 SO- <br /> TOOLCT. If the stop is not at tete correct position it must <br /> be fixed before driling. <br /> CAUTION:it the drUl stop is not in ttm proper loca- <br /> tion frilure of pressure detay leak tett may resuK, <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.