Laserfiche WebLink
Vapor Recovery <br /> i Fill Rises <br /> w <br /> OPw ' <br /> Ball Float <br /> 14"Mi nim urn <br /> Clearance for <br /> Tu be Cut Float 4* NPT <br /> per Local Nipple <br /> Requirements <br /> a <br /> .— Align Float Along Length of Tank --a.. Swive) <br /> Piqun24 Product a Jack <br /> Adaptor Screw <br /> Kit <br /> OmRt socket <br /> adaptor be` FOR TESTABLE)41WILS UMLV= Check+nmilatior, <br /> tween jack again as done in Step 23 to ensure poppet actuates and <br /> screw bolts resets properly. See page 17 for ful testi ng details_ Ap- <br /> ply pipe dope to the socket adaptor threads. Pipe dope <br /> should be a non-hardening gasoline resistant pipe <br /> thread seal compound. Install socket adaptor and <br /> torque to 35 ftabs(42 in-bs)minimum to 5.0 ft-lbs(60 <br /> In-Ibs)maximum. After instal ling socket adaptor where <br /> regU red,pressure test tenable overfill naive per CARD <br /> TP201.I D to ensure valve is vapor tight. <br /> Figure 24A <br /> 75 <br />