My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2026 2:28:04 PM
Creation date
3/28/2024 2:04:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0506488
PE
2361 - UST FACILITY
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190A
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4943 S STATE ROUTE 99 STOCKTON 95215
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP 25: INSTALL WARNING PLATE <br /> Bend the three warning plate ears down them slide the <br /> tie wrap over the warning pkate ears and position warn- <br /> ing plate agatnst riser pipe approxinvalely 1"below the <br /> adaptor. Tighten theila wrap securely. Thevahe is <br /> now fully Insuled and In operating position_ <br /> HOTS the warnirp plate KwJudes lonpoata nt warn- <br /> k1gs,operating puarr atm,and 16fi" Infon„ation t7 <br /> &nd must ha instaMad. <br /> �0o <br /> 1 <br /> Manufacturer:"OPVrP' <br /> Modet*7150-4- <br /> (4*represents stno <br /> Manufacture Date: <br /> "MFG iMMYY' <br /> WmManwth YY-Year <br /> flg m 26-Pr"Wt#den O&A dad <br /> Fowre 2s <br /> STEP 26: VALVE REMOVAL <br /> The vaiw can be removed For tank Leak testing,Inspec- <br /> tion,etc,by removing the Rota sable Product Adaptor, <br /> the 4"nipple,and the lack Screw Kit. Reinstal I per the <br /> above Instxictions. <br /> Tor teMble models only: Itis not necessary to re- <br /> move the vatwe to cheek poppet movernent l function. <br /> See Page 17 for full testing details. <br /> STEP 27: ELECTRONIC LIQUID LEVIEL.MONITORING <br /> If an electronic level neon+tor is installed, it must be calt- <br /> brated to match the top of the 7150 valve body,which <br /> must cornet ate with 95%of the actual tank capacity, <br /> 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.