My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2026 2:28:04 PM
Creation date
3/28/2024 2:04:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0506488
PE
2361 - UST FACILITY
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190A
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4943 S STATE ROUTE 99 STOCKTON 95215
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
71 STOOL PROCEDURE BUJOW, Snp 14A, 11GI TIN THE 7i S011 <br /> FOR 71 SO-TOOL.C,SEE PAGE 9 use the three view holes to ensure that the tool seats <br /> FOR 71 SO-TOO=SU PAGE 18 out flat against the top of the inlet tine. To prevent <br /> vertical movement of the tool during drilling,hand <br /> Nowa. a1SO..TOOL can ordy be used with tastuble tighten all three knots F+enty to the upper drop tuba <br /> ove M naives If rnodified as shown below. A 2' Set Figure 1 a#- <br /> wide slut must be add*d to accommodate tact lug <br /> STEP'11 A. PREPARE inti U AND Orr <br /> d 7 widea Confirm that the stop on the 3/1W drill bit supplied <br /> Ad <br /> Adt 2 use with tine 7154TWL is iii the correct position before <br /> } 'ITtestable valves <br /> drilling to <br /> The stop is factory installed at a distance be <br /> 't testable r to 2-1/16"frorn the tip with the 7150-TOOL If <br /> i the stop is not at the correct position it must be fixed <br /> before drilling. <br /> CAUTIONS If the drill stoop ir,not in the proper lou- <br /> kr k '` tion failure of a pra"um deW leak tat may result. <br /> 1• <br /> 71 SG-TOOL Modlficatians for Tastable Inlet <br /> STEP Vk INSERT 71SO-TOOL OWER INLET TUTAE <br /> To install the 7150-TOX(sold separately)over the in <br /> tubP_first loosen all tMee knobs,sa the tool can pass Tip to stop dimempon must be <br /> frbelyr over the inlet tube flange. Align the slot on the 7°to 2-1/16'. <br /> tool with ttre key on the}nlet tube and insert Mt tool <br /> down. So*Figtms gel. l�igtue 71A <br /> tLMOSM STEP 12A: DRILL HOLES <br /> Twl]dot baba Vkm hoes tighten With the inlet tube and 71 SU-TOOL In piaee,carefully <br /> w,ob: drill a 3/16'diarnmer hole in the upper tube using the <br /> eve* drill bushing in the knob as a guide. The drill strop is po- <br /> sitioned so It will bottom taut against the knob aper the <br /> tact has dniled through the upper drop tube. If the stop <br /> is positioned wrong either rvo hole will be drilled,or a <br /> thi Qugh hole cnuId potentially be drilled dwough the <br /> r )niet tube. it no hole is drilled return to step I IA and <br /> i cherck rhe stop dimension. If a help is drilled through <br /> the inlet tube or into the screw We the assembly is not <br /> i salvageable, grill(2)more holes in the two remaining <br /> Tube know <br /> ikey <br /> � I 1 <br /> Dill thru uFper <br /> FVMM FSA Figure IOA tube only <br /> PFA..12,igure 12A <br /> R <br />
The URL can be used to link to this page
Your browser does not support the video tag.