My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2026 2:28:04 PM
Creation date
3/28/2024 2:04:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0506488
PE
2361 - UST FACILITY
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190A
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4943 S STATE ROUTE 99 STOCKTON 95215
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
71 SO-TDOLC PROCEDURE 80LOW, STEP 11 B: PREWARE DRILL AND Birt <br /> FOR 71 SO-TOOL,SEL PAGE 8 Confi rm [hat the jtap on the 3/16`drill b(T supp(fed <br /> FM 71SO.TOOLC E SEE PAGE 10 with the 7150-TOOLC is in the correct go:Aort before <br /> drillinq. The stop is factory installed at a distance be- <br /> Now, 7150-TOOLCcest only be used with eesubh trivet: 1-3/16'to 1-1/4'fmm Ow tip with d*71 SO- <br /> overfill walvas if rnodi iied as shown below. TOOLC. If the stop is not at the correct position R must <br /> befixed before drilling. <br /> - CAUtI N: lit"drill stDp Is not in-dw proper io"- <br /> _ J• l don f4lu re of a pressure decay%ek test may result. <br /> ' + 7150 -TOOLC <br /> i <br /> AO a TO-24 UNC thread at idrn 1Wr <br /> to all three legs of ttie 7 i SO- Tip to stop dimension must <br /> TOOL C in the area shown. Use set be"-3/16'to 1-1/4' <br /> snrws to serum WVl to upper ACOA" 1149 <br /> nibe- <br /> STEP 126: OIULL KCK ES <br /> 71 SO-TOOLC A4ddifieetiM&for Table host With the inlet tube and 71 SO-TOOLC in piaci►,carefu11y <br /> drill a 3116'dia meet iirok In the upper tube ustrrg the <br /> STEP 91: IM$MT 71$Oi-'I'OOt.0 OVIR MLET TUBE hole in the 71 SO-TOOLC as a guide. The drill stop is po- <br /> To install the 71 SO-TOOK(wid separately)aver the sitioned so it will bottom out against the tool after the <br /> inlet u,be,f rsr loosen the thumb screw, sO the tool can bit has drilled through the upper drop tube. if the stop <br /> passfreeiy over the inlet tube flange- Align the s1ot on is positioned wrong eithtr no hole will be drilled,or a <br /> the tool wlttt the key on the inlet tube and insert the through hose could potentially be drilled through the <br /> tool down. SwAgwe9& inlettube. ifno hole is drilled rMrn to step 118 and <br /> cool slot Hand tgh ter,thumb strew check the stop dimension. If a hole+s drfilled through <br /> the inlet tube or into the screw hole the assembly is net <br /> salvageable. Drill (2)more holes in the two remaining <br /> guide hales. <br /> Loosen , <br /> thumb <br /> sum <br /> nlet <br /> Tube r <br /> ktr I Yr �1 <br /> V I or+sr.�nwv.r a►r.wh <br /> STEP 108: TIGHTEN THE 71 SO-TOOLC Fin 128 <br /> Ensure that the cool seats flat against the top of rhe inlet <br /> tube. Topreventvertical movement of the coal during <br /> drilling,hand tighten the thurnb screw against tt*up- <br /> per dsop tube. See FMpwe lei), <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.