My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2026 2:28:04 PM
Creation date
3/28/2024 2:04:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0506488
PE
2361 - UST FACILITY
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190A
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4943 S STATE ROUTE 99 STOCKTON 95215
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vapor Recovery Fill Riser <br /> w <br /> OPW <br /> �j <br /> Ball Float <br /> 14"hili nim un1 <br /> Clearance for <br /> Tube Cut Float 4"NPT <br /> per Local Nipple <br /> Requirements <br /> a <br /> .— Align Float Along Length of Ta nk Swivel <br /> "Ort 24 Product f Jack <br /> Adaptor Screw <br /> Kit <br /> orient socket <br /> adaptor beL FOR MTABLf i410DILS ONLY: Check insmila6orr <br /> tween jack again as done in Step 23 to ensure poppet actuates and <br /> Knew bolts resets properly, See page 17 for fua testing details_ Ap <br /> ply pipe dope to the socket adaptor threads. Pipe dope <br /> should be a norrhardening gasoline resistant pipe <br /> thread zeal compound. Install socket adaptor and <br /> torque to 3S ft-lbs(42 in-in)minimum to 5.0 ft-Ibs(60 <br /> in-Ibs)maximum. After in stalling socket adaptor where <br /> required,pressure test testable overfill valve per CARB <br /> TP201.l D to ensure value is vapor tight <br /> ire 24A <br /> ]5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.