My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2024
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
COMPLIANCE INFO_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2026 2:28:04 PM
Creation date
3/28/2024 2:04:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2024
RECORD_ID
PR0506488
PE
2361 - UST FACILITY
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190A
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
4943 S STATE ROUTE 99 STOCKTON 95215
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP 25: INSTALL WARN11NG PLATE <br /> Bend the three warning plate ears down them slide the <br /> tie wrap over the wartzing qWe ears and posiWn warn- <br /> ing plate against riser pipe approxurwleiy 1"below the <br /> adaptor. Tighten thetle wrap securely. ThevafvQ is <br /> ryow fully lnstaled and in operating position. <br /> NOTE: the wwnbV p4te kKkides iretpaYa nt warn- <br /> ings,operating parameWs,NO IisWrg infornetion Oe <br /> &nd must ba inttaMMd115014. a� <br /> 000, <br /> e0 <br /> 1 <br /> Manufacturer:"bPW* <br /> Modet"71 SO-4- <br /> (4'repw"nts size) <br /> Man ufactt,re Date: <br /> "MFG WMYr <br /> NIMP- unth YY-Year <br /> lYce <br /> c RqWT 26-Ti"Wr hknd6edtfWft <br /> ftm 25 <br /> STEP 26: VALVE REhWAL <br /> The valve can be removed For tank leak testing,Inspec- <br /> tlan,etc.,by removing the Rotatable Product Adaptor, <br /> the 4" nipple,and tht-lack Screw Kit. Reinstall per the <br /> above insMictions. <br /> Fortemhle models only: It is not necessary to re- <br /> move the valve to check poppet rrtiovernent/function. <br /> See Page 17 for full testing details. <br /> STEP 27: ELECTRONIC LIQUID L.EYIFL MONUORING <br /> If an electronic levg1 monitor is invalied,it must be cali- <br /> brated to match the top of the 7150 valve body,which <br /> must correlate with 95%of the actual tank capacity, <br /> i+5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.