My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2023
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
CORRESPONDENCE_2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2024 11:52:37 AM
Creation date
4/12/2024 9:10:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2023
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
217
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FORWARD LANDFILL <br />RESOURCE & RECOVERY <br />2023-2024 WINTERIZATION PLAN <br />October 2023 <br />1. Grinding Pad & Sorting Pad <br />The pad has been graded such that the water flows to one of three onsite conveyances leading <br />directly to the lined impoundment on the west side of the Resource & Recovery (R & R) area. <br />2. Compost Pad <br />Composting activities are being performed on an approximately 20 -acre area. The composting <br />activities are limited to green waste materials. <br />3. Transfer Station <br />The transfer of recyclables is performed within the twelve thousand square feet (12,000 sq) building <br />located on the eastern end and middle (North-South) of the R & R area. Rainwater from the roof <br />of the building is directed from the down spouts to the existing conveyances and then to the lined <br />impoundment. <br />4. Lined Impoundment <br />All water is held in the lined impoundment and then sampled and analyzed in accordance with <br />applicable Regional Water Quality Control Board (RWQCB) monitoring requirements. <br />5. Roads <br />All roads have been graded to provide a safe and stable surface for travel and to direct runoff to the <br />existing conveyances that route to the lined impoundment. Roads will be cleared of mud as needed <br />to prevent tracking onto Austin Road. Forward has constructed a tire wash station along the main <br />exit road of the FRRF that is used to clean truck tires. The tire wash station was completed in July <br />2014. In addition, exit roads and Austin Road will be reviewed on an hourly basis and will be <br />cleaned by sweeper truck and water truck, as needed, to prevent any build-up of mud. <br />
The URL can be used to link to this page
Your browser does not support the video tag.