Laserfiche WebLink
Spill Prevention Control and Countermeasures Plan <br /> T & T TRUCKING, INC. <br /> 11396 North Highway 99, Lodi, California <br /> TABLE OF CONTENTS <br /> SECTION PAGE <br /> 1.0. INTRODUCTION AND PURPOSE........................................................................ 1 <br /> 2.0. PLAN AMMENDMENTS - 40 CFR 112.3 and 112.5 ............................................ 1 <br /> 2.1. SCHEDULED PLAN REVIEWS............................................................................2 <br /> 3.0. PLAN ADMINISTRATION AND FACILITY INFORMATION.................................2 <br /> 3.1. MANAGEMENT AND DESIGNATED PERSONNEL - 40 CFR 112.7................... 2 <br /> 3.2. PROFESSIONAL ENGINEER CERTIFICATION - 40 CFR 112.3(d).................... 3 <br /> 3.3. PLAN AVAILABILITY - 40 CFR 112.3(e).............................................................. 3 <br /> 3.4. CROSS-REFERENCE WITH SPCC PROVISIONS (40 CFR 112.7).................... 3 <br /> 3.5. FACILITY DESCRIPTION - 40 CFR 112.7(a)(3) .................................................. 3 <br /> 3.5.1. Location and Activities.................................................................................4 <br /> 3.5.2. Facility Operating Structures and Areas ......................................................4 <br /> 3.5.3. Distance to Navigable Waters and Adjoining Shorelines and Flow Paths ... 5 <br /> 3.5.4. Discharge History ........................................................................................ 5 <br /> 3.5.5. Material Stored at this Facility— 112.7(a)(3)(i)............................................. 5 <br /> 4.0. DISCHARGE PREVENTION - GENERAL SPCC PROVISIONS..........................6 <br /> 4.1. COMPLIANCE WITH APPLICABLE REQUIREMENTS - 40 CFR 112.7(a)(2)..... 6 <br /> 4.2. SPILL REPORTING - 40 CFR 112.7(a)(4) ........................................................... 7 <br /> 4.3. POTENTIAL DISCHARGE VOLUMES AND DIRECTION OF FLOW-40 CFR 112.7(b).............. 7 <br /> 4.4. CONTAINMENT AND DIVERSIONARY STRUCTURES - 40 CFR 112.7(c)........ 7 <br /> 4.4.1. Spill Pallets.................................................................................................. 7 <br /> 4.4.2. Berm Enclosure ........................................................................................... 7 <br /> 4.4.3. Transfer Areas............................................................................................. 7 <br /> 4.4.4. Drainage System ......................................................................................... 8 <br /> 4.4.5. Practicability of Secondary Containment— 40 CFR 112.7(d)........................ 8 <br /> 4.5. INSPECTIONS, TESTS, AND RECORDS - 40 CFR 112.7(e).............................. 8 <br /> 4.5.1. Daily Inspection ........................................................................................... 8 <br /> 4.5.2. Monthly Inspection....................................................................................... 8 <br /> 4.5.3. Annual Inspection ........................................................................................ 9 <br /> 4.5.4. Periodic Integrity Testing ............................................................................. 9 <br /> 4.6. DISCHARGE PREVENTION PROCEDURES AND TRAINING-40 CFR1 12.7(f)...... 9 <br /> 4.7. SECURITY - 40 CFR 112.7(g)............................................................................ 10 <br /> 4.8. TANK TRUCK LOADING/ UNLOADING RACKS - 40 CFR 112.7(h) ................. 10 <br /> 4.9. BRITTLE FRACTURE EVALUATION - 40 CFR 112.7(i).................................... 10 <br /> 4.10. CONFORMANCE WITH LOCAL REQUIREMENTS - 40 CFR 112.70) ........... 11 <br /> 4.11. QUALIFIED OIL-FILLED OPERATIONAL EQUIPMENT - 40 CFR 112.7(k).... 11 <br />