Laserfiche WebLink
Spill Prevention Control and Countermeasures Plan <br /> T & T TRUCKING, INC. <br /> 11396 North Highway 99, Lodi, California <br /> TABLE OF CONTENTS <br /> SECTION PAGE <br /> 5.0. DISCHARGE PREVENTION — SPCC PROVISIONS FOR THE FACILITY........ 11 <br /> 5.1. FACILITY DRAINAGE - 40 CFR 112.8(b) ......................................................... 11 <br /> 5.2. BULK STORAGE CONTAINERS - 40 CFR 112.8 (c)......................................... 12 <br /> 5.2.1. Construction - 40 CFR 112.8 (c)(1) ........................................................... 12 <br /> 5.2.2. Secondary Containment - 40 CFR 112.8 (c)(2) ......................................... 12 <br /> 5.2.3. Drainage of Berm Areas - 40 CFR 112.8(c)(3) .......................................... 12 <br /> 5.2.4. Corrosion Protection - 40 CFR 112.8(c)(4)................................................ 13 <br /> 5.2.5. Partially Buried and Bunkered Storage Tanks - (40 CFR 112.8(c)(5))....... 13 <br /> 5.2.6. Inspections and Tests - 40 CFR 112.8(c)(6).............................................. 13 <br /> 5.2.7. Heating Coils - 40 CFR 112.8(c)(7) ........................................................... 13 <br /> 5.2.8. Overfill Prevention Systems - 40 CFR 112.8(c)(8)..................................... 13 <br /> 5.2.9. Effluent Treatment Facilities - 40 CFR 112.8(c)(9) .................................... 14 <br /> 5.2.10. Visible Discharges - 40 CFR 112.8(c)(10).................................................. 14 <br /> 5.2.11. Mobile and Portable Containers - 40 CFR 112.8(c)(11) ............................. 14 <br /> 5.3. TRANSFER OPERATIONS, PUMPING, AND IN-PLANT PROCESSES ........... 14 <br /> 5.3.1. Transfer Lines Not In-Service.................................................................... 15 <br /> 5.3.2. Standby Transfer Lines.............................................................................. 15 <br /> 5.3.3. Pipe Supports............................................................................................ 15 <br /> 5.3.4. Aboveground Piping and Valves................................................................ 15 <br /> 5.3.5. Underground Piping................................................................................... 15 <br /> 6.0. FACILITY DISCHARGE RESPONSE................................................................. 15 <br /> 6.1. MINOR DISCHARGE RESPONSE .................................................................... 16 <br /> 6.1.1. Minor Discharge Description...................................................................... 16 <br /> 6.1.2. Minor Discharge Cleanup and Guidelines ................................................. 16 <br /> 6.2. MAJOR DISCHARGE RESPONSE.................................................................... 16 <br /> 6.2.1. Major Discharge Description...................................................................... 17 <br /> 6.2.2. Major Discharge Cleanup and Guidelines ................................................. 17 <br /> 6.3. WASTE DISPOSAL............................................................................................ 18 <br /> 6.4. WRITTEN DISCHARGE NOTIFICATION........................................................... 18 <br /> 6.5. CLEANUP CONTRACTORS AND EQUIPMENT SUPPLIERS .......................... 19 <br />