Laserfiche WebLink
Location:CGRS Project No : <br />Test Date: <br />CGRS Techs: <br />IOTA Tech Signature: <br />Sergio L. Nunez CA Tank Tester #06-1727 <br />Reviewed by: <br />Chris Murphy Director of CA Services <br />Test Certification <br />Post Installation Enhanced Leak Detection (ELD) <br />61-27352 <br />Chevron August 18, 2023 <br />16460 Golden Valley Parkway Sergio L. Nunez <br />Lathrop, CA 95330 <br />Post Installation ELD Test Results <br />87 Octane Primary Containment System PASS <br />91 Octane Primary Containment System PASS <br />Diesel Primary Containment System PASS <br />8/23/2023 <br />Date <br />Bio-Diesel Primary Containment System PASS <br />8/18/2023 <br />Date <br />E85 Primary Containment System PASS <br />This document certifies that the UST systems listed below at the above referenced location have been tested <br />and passed the iota® VaporTite V005 tightness test and iotaVision L005. CGRS further certifies that the <br />iota® VaporTite V005 and iotaVision L005 meets the post installation testing requirements for post <br />installation testing for newly installed underground storage tank systems as per the California Health and <br />Safety Code, Chapter 6.7, section 25290.1(j)(1).