Laserfiche WebLink
Final Test Date: IOTA Technicians: <br />Site Information CGRS Project No : 61-27352 Installation Contractor Information <br />Facility: Customer Name: <br />Address: Address: <br />City, State, Zip: City, State, Zip: <br />County: Contact: <br />CUPA Contact: Phone/Email: <br />CUPA Email: <br />Tank No. Capacity (gal.) Product Type Manufacturer Brine Test Result <br />Tank 1 20,000 87 Octane DW Fiberglass CSI Yes PASS <br />Tank 2 10,000 91 Octane DW Fiberglass CSI Yes PASS <br />Tank 3 10,000 Diesel DW Fiberglass CSI Yes PASS <br />Tank 4 10,000 Bio Diesel DW Fiberglass CSI Yes PASS <br />Tank 5 10,000 E85 Octane DW Fiberglass CSI Yes PASS <br />Tank Top Sumps Diameter (in.) Depth (in.) Volume (gal.) Description <br />Test Result <br />S1 48 72 564.02 87 TS PASS <br />S2 42 72 431.83 87 FS PASS <br />S3 48 72 564.02 91 TS PASS <br />S4 42 72 431.83 91 FS PASS <br />S5 48 72 564.02 DSL TS PASS <br />S6 42 72 431.83 DSL FS PASS <br />S7 48 72 564.02 BioDSL TS PASS <br />S8 42 72 431.83 BioDSL FS PASS <br />S9 48 72 564.02 E85 TS PASS <br />S10 42 72 431.83 E85 FS PASS <br />Junction Boxes with Tank Connection Description <br />Test Result <br />S1 Tank Probe and Turbine J-Box Open During Test PASS <br />S3 Tank Probe and Turbine J-Box Open During Test PASS <br />S5 Tank Probe and Turbine J-Box Open During Test PASS <br />S7 Tank Probe and Turbine J-Box Open During Test PASS <br />S9 Tank Probe and Turbine J-Box Open During Test PASS <br />UDCs Length (in.) Width (in.) Depth (in.) Volume (gal.) Description <br />Test Result <br />UDC1 42 24 32 139.64 Bravo PASS <br />UDC2 42 24 32 139.64 Bravo PASS <br />UDC3 42 24 32 139.64 Bravo PASS <br />UDC4 42 24 32 139.64 Bravo PASS <br />UDC5 42 24 32 139.64 Bravo PASS <br />UDC6 42 24 32 139.64 Bravo PASS <br />UDC7 42 24 32 139.64 Bravo PASS <br />UDC8 42 24 32 139.64 Bravo PASS <br />Transition Sump Length (in.) Width (in.) Depth (in.) Volume (gal.) Description <br /> Test Result <br />TS1 42 22 32 128.00 Bravo PASS <br />Product Piping Manufacturer Type Size (in.) Length (ft.) <br /> Test Result <br />87 PL NOV DW Fiberglass 2 350 PASS <br />91 PL NOV DW Fiberglass 2 320 PASS <br />DSL PL NOV DW Fiberglass 2 225 PASS <br />BioDSL PL NOV DW Fiberglass 2 185 PASS <br />E85 PL NOV DW Fiberglass 2 125 PASS <br />Vent Piping Manufacturer Type Size (in.) Length (ft.) <br />Test Result <br />87 Vent NOV DW Fiberglass 2 50 PASS <br />91 Vent NOV DW Fiberglass 2 65 PASS <br />DSL Vent NOV DW Fiberglass 2 50 PASS <br />BioDSL Vent NOV DW Fiberglass 2 80 PASS <br />E85 Vent NOV DW Fiberglass 2 65 PASS <br />Vapor Piping Manufacturer Type Size (in.) Length (ft.)Test Result <br />VR NOV DW Fiberglass 3 345 PASS <br />Reviewed By Date IOTA Tech Signature Date <br />Final ELD Test Project Worksheet <br />8/18/2023 <br />Chevron Savidge Construction <br />Sergio L. Nunez <br />ust@sjgov.org <br />PIPING <br />TANKS <br />16460 Golden Valley Parkway 4401 Sonja Court <br />Placerville, CA 95667 <br />COMPONENTS IN CONTAINMENT <br />San Joaquin Dennis Parikka <br />San Joaquin County Environmental Health 916-240-2108/dparikka@gmail.com <br />Leak Logs / Repair <br />Lathrop, CA 95330 <br />8/18/2023 <br />CA License No. <br />8/23/2023 06-1727