My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_4/7/22 ASP RCSI APPENDICES
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
CORRESPONDENCE_4/7/22 ASP RCSI APPENDICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2024 9:15:14 AM
Creation date
5/14/2024 10:49:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
4/7/22 ASP RCSI APPENDICES
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
336
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> Forward Compost Facility Stormwater Improvements 01100 4 SUMMARY <br />circumstances, in writing by the particular manufacturer. The CONTRACTOR will be held responsible for all installations not conforming to the manufacturers' recommendations. If any item of material or equipment is found to be installed not in accordance with the manufacturer's recommendations, the CONTRACTOR shall make all changes necessary to achieve such compliance. 1.10 WORK QUALITY A. Work shall be performed by mechanics and workers skilled and experienced in the fabrication and installation of the Work feature involved. All Work under this Contract shall be performed in accordance with the best practices of the various trades involved and in accordance with the Construction Drawings, reviewed shop drawings, and the Agreement Conditions. B. All Work shall be erected and installed plumb, level, square and true, or true to indicated angle, and in proper alignment and relationship to the Work of other trades. All finished Work shall be free from defects and damage. C. The QA/QC CONSULTANT reserves the right to reject any materials and Work quality that are not considered to be up to the general standards of the various trades involved. Such inferior material or Work quality shall be repaired or replaced, as directed, at no additional cost to the OWNER. 1.11 FIELD MEASUREMENT A. CONTRACTOR shall secure all field measurements required for proper and accurate fabrication and installation of the Work included in this Contract. Exact measurements are the CONTRACTOR's responsibility. The CONTRACTOR shall verify all dimensions in the field. 1.12 ACCESS TO WORK A. The authorized representatives of the following agencies will also have the right of access to inspect the Work covered by these Contract Documents during the performance of this Contract: 1. California Department of Resources Recycling and Recovery (CalRecycle). 2. San Joaquin County Department of Health Services. 3. San Joaquin County Air Pollution Control District. 4. Central Valley Regional Water Quality Control Board. 5. Other Local, State, and Federal Agencies. B. These inspections will be performed in the presence of the OWNER and QA/QC CONSULTANT. Reasonable facilities for the proper handling and inspection of the materials and the Work shall be furnished by the CONTRACTOR. 1.13 TESTING LABORATORY A. The QA/QC CONSULTANT will select and pay for the services of a testing laboratory(s) to conduct earthwork and other tests as required in the CQA Manual, except where the CONTRACTOR is specifically required to perform the testing. The costs of retests or additional testing caused by the CONTRACTOR's operations may be deducted from the payment due the CONTRACTOR. 1.14 PERMITS AND LICENSES
The URL can be used to link to this page
Your browser does not support the video tag.