My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_4/7/22 ASP RCSI APPENDICES
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
CORRESPONDENCE_4/7/22 ASP RCSI APPENDICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2024 9:15:14 AM
Creation date
5/14/2024 10:49:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
4/7/22 ASP RCSI APPENDICES
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
336
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> Forward Compost Facility Stormwater Improvements 02300 11 EARTHWORK <br />2. Equipment used to place and compact the coarse gravel shall be not travel <br />directly on the underlying geomembrane. <br />3. The EARTHWORK CONTRACTOR shall use low ground pressure <br />equipment to place the coarse gravel. The following table shall be complied <br />with during construction: <br /> <br />Maximum <br />Equipment Ground Pressure <br />(psi) <br /> <br />Initial Lift Thickness <br />(ft) <br />< 5 0.5 <br />5 1.0 <br />10 1.5 <br />20 2.0 <br />>20 >3.0 <br /> <br /> 3. Method of dumping and spreading materials shall be approved by the <br />QA/QC CONSULTANT and shall ensure uniform distribution of the <br />material and prevent damage to the underlying geotextile and geomembrane <br />lining. Approval does not absolve the EARTHWORK CONTRACTOR of <br />responsibility for damage to underlying components. <br /> 4. Compaction of Coarse Gravel shall be accomplished by shovel-slicing <br />during dumping, and taking necessary precautions to prevent damage to <br />underlying geosynthetics. <br /> <br /> C. Quality Control: <br /> <br /> 1. General: As the Coarse Gravel material is being placed, the QA/QC <br />CONSULTANT will be monitoring the construction activities and soil <br />properties. If acceptance tests conducted by the QA/QC CONSULTANT <br />indicate that the Coarse Gravel does not meet specified requirements, the <br />EARTHWORK CONTRACTOR shall terminate material placement until <br />corrective measures are taken. <br /> 2. Coarse Gravel Acceptance: Final acceptance of the Coarse Gravel will be <br />based on all tests made on completed Work or on samples of material taken <br />from the completed layer. Testing for final acceptance shall be performed <br />by the QA/QC CONSULTANT in accordance with these Specifications and <br />the CQA Manual. <br /> <br /> D. Protection: <br /> <br /> 1. Do not route construction traffic on top of Coarse Gravel layer once <br />material has been placed. <br /> 2. Constructed Coarse Gravel layer shall be maintained to meet the <br />requirements of this Specification until final completion and acceptance of <br />the Work. This shall include all measures to prevent erosion. During <br />seasonal or other extended shutdowns, all exposed surfaces shall be
The URL can be used to link to this page
Your browser does not support the video tag.