My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_4/7/22 ASP RCSI APPENDICES
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
CORRESPONDENCE_4/7/22 ASP RCSI APPENDICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2024 9:15:14 AM
Creation date
5/14/2024 10:49:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
4/7/22 ASP RCSI APPENDICES
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
336
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> Forward Compost Facility Stormwater Improvements 02300 15 EARTHWORK <br />compaction will not be acceptable. <br /> <br />E. Place CLSM in pipe trenches as shown on the Construction Drawings. <br /> <br />3.15 SLURRY CEMENT MIXTURE AND CLSM <br /> <br /> A. Place slurry cement mixture or CLSM at the locations shown on the Construction <br />Drawings. <br /> <br /> B. The EARTHWORK CONTRACTOR shall repair or replace any materials <br />damaged during placement of the slurry cement mixture or CLSM, at the <br />EARTHWORK CONTRACTOR’s sole expense. <br /> <br />3.16 CONCRETE <br /> <br /> A. Construct concrete at the locations shown on the Construction Drawings in <br />accordance with the provisions in CalTrans Standard Specification Section 90-10, <br />Minor Concrete. <br /> <br /> B. Place reinforcing steel in Concrete Headwalls as detailed on the Construction <br />Drawings. <br /> <br />3.17 PIPE SUPPORT AND PIPE CLAMP <br /> <br /> A. Install at the locations shown on the Construction Drawings. <br /> <br />3.18 POND SAFETY LADDER <br /> <br /> A. The pond safety ladder shall be placed at the approximate locations shown on the <br />Construction Drawings. The minimum spacing between ladders shall be 50-ft. <br /> <br /> B. The pond safety ladder shall be anchored in the anchor trench using No 4 rebar to <br />aid in securing the pond safety ladder in the anchor trench. <br /> <br />3.19 SITE GRADING <br /> <br /> A. Perform all earthwork to the lines and grades as shown on the Construction <br />Drawings and/or established by the DESIGN ENGINEER. Shape, trim, and finish <br />slopes of channels to conform with the lines, grades, and cross sections shown. <br />Make slopes free of all exposed roots and stones exceeding 3-inch diameter that <br />are loose and liable to fall. Round tops of banks to circular curves, in general, not <br />less than a 6-foot radius. Rounded surfaces shall be neatly and smoothly trimmed. <br /> Neatly blend all new grading into surrounding, existing terrain, and maintain <br />current drainage patterns or modify drainage as shown on the Construction <br />Drawings. Overexcavating and backfilling to the proper grade will not be <br />acceptable. Finished site grading will be reviewed by the QA/QC <br />CONSULTANT. <br /> <br />3.20 TOLERANCES
The URL can be used to link to this page
Your browser does not support the video tag.