My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_4/7/22 ASP RCSI APPENDICES
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
CORRESPONDENCE_4/7/22 ASP RCSI APPENDICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2024 9:15:14 AM
Creation date
5/14/2024 10:49:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
4/7/22 ASP RCSI APPENDICES
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
336
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> Forward Compost Facility Stormwater Improvements 02300 2 EARTHWORK <br /> A. General: The EARTHWORK CONTRACTOR shall ensure that all submittals are complete and approved in accordance with the requirements and procedures in this Section. All submittals must include the reference numbers shown in this Section. B. Submittals Required After Contract Award and Prior to Construction. 1. Material Certification (EW1A): Certification, test results, source, and samples for all EARTHWORK CONTRACTOR supplied imported material as required by Article 1.4, IMPORTED MATERIAL ACCEPTANCE, of this Specification Section. 1.4 IMPORTED MATERIAL ACCEPTANCE A. All imported materials specified in this specification section are subject to the following requirements: 1. All tests necessary for the EARTHWORK CONTRACTOR to locate an acceptable source of imported material shall be made by the EARTHWORK CONTRACTOR. Certification that the material conforms to the Specification requirements along with copies of the control test results from a qualified commercial testing laboratory shall be submitted to the QA/QC CONSULTANT for approval at least 10 days before the material is required for use. All material samples shall be furnished by the EARTHWORK CONTRACTOR at his sole expense. Samples shall be representative and be clearly marked to show the source of the material and the intended use on the project. Sampling of the material source shall be done by the EARTHWORK CONTRACTOR in accordance with ASTM D75. Notify the QA/QC CONSULTANT at least 24 hours prior to sampling. The QA/QC CONSULTANT may observe the sampling procedures. Tentative acceptance of the material source shall be based on an inspection of the source by the QA/QC CONSULTANT and/or the certified test results submitted by the EARTHWORK CONTRACTOR to the QA/QC CONSULTANT. No imported materials shall be delivered to the site until the proposed source and material control tests have been tentatively accepted in writing by the QA/QC CONSULTANT. Final acceptance will be based on all tests made on samples of material taken from the completed and compacted course. All acceptance testing for final acceptance shall be performed by the QA/QC CONSULTANT. 2. Particle size control tests by the EARTHWORK CONTRACTOR shall be made on samples taken at the place of production prior to shipment. Samples for particle size control testing shall be taken in accordance with the frequency listed in Table 02300-1 or more often as determined by the QA/QC CONSULTANT, if variation in gradation is occurring, or if the material appears to depart from the Specifications. 3. If during placement of the material, control tests conducted by the EARTHWORK CONTRACTOR or the acceptance tests conducted by the QA/QC CONSULTANT indicate that the material does not meet Specification requirements, material placement will be terminated until corrective measures are taken. Material that does not conform to the Specification requirements and is placed in the Work shall be removed and replaced at the EARTHWORK CONTRACTOR's sole expense. Sampling and control testing performed by the EARTHWORK CONTRACTOR shall
The URL can be used to link to this page
Your browser does not support the video tag.