My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_4/7/22 ASP RCSI APPENDICES
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
CORRESPONDENCE_4/7/22 ASP RCSI APPENDICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2024 9:15:14 AM
Creation date
5/14/2024 10:49:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
4/7/22 ASP RCSI APPENDICES
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
336
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Forward Compost Facility Stormwater Improvements 02535 4 PIPES <br /> B. Butt-Fusion Joining: Butt-fusion of pipes and fittings shall be performed in <br />accordance with the pipe manufacturer's recommendations as to equipment and <br />technique. Depending on site conditions, butt-fusion joining shall be performed <br />in or outside of the excavation at the EARTHWORK CONTRACTOR's option. <br /> <br /> <br />3.6 PLACEMENT OF RISER PIPE <br /> <br /> A. Place riser pipe at location shown on the Construction Drawings. <br /> <br /> B. Connect pipe sections by thermal butt fusion. <br /> <br /> C. Construct riser support as described in Section 02300, EARTHWORK. <br /> <br />3.7 PLACEMENT OF POND INLET PIPE/CULVERTS <br /> <br /> A. Place pond inlet pipes/culverts at locations shown on the Construction Drawings. <br /> <br /> B. Connect pipe sections by thermal butt fusion. <br /> <br /> C. Backfill pipe trenches as shown on the Construction Drawings. <br /> <br /> D. Place and weld prefabricated HDPE boot at penetration of inlet pipe at the pond. <br /> <br /> E. Place one way valve at end of pipe at location shown on the Construction <br />Drawings. <br /> <br /> <br />3.8 PROTECTION OF PIPE <br /> <br /> A. No construction traffic shall cross the pipe without sufficient cover as determined <br />by the DESIGN ENGINEER. <br /> <br /> <br /> <br /> <br />PART 4 MEASUREMENT AND PAYMENT (Refer to Section 01200, MEASUREMENT <br />AND PAYMENT PROCEDURES) <br /> <br /> END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.