My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_4/7/22 ASP RCSI APPENDICES
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440011
>
CORRESPONDENCE_4/7/22 ASP RCSI APPENDICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2024 9:15:14 AM
Creation date
5/14/2024 10:49:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
4/7/22 ASP RCSI APPENDICES
RECORD_ID
PR0440011
PE
4445
FACILITY_ID
FA0006918
FACILITY_NAME
FORWARD RESOURCE RECOVERY FACI
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
336
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Page 23 <br /> The Geosynthetics Contractor has certified in writing that the surface on which the <br />geomembrane will be installed is acceptable. <br /> <br />Panel Placement. Before installing any of the geomembrane, the Geosynthetics Contractor must <br />submit a drawing in accordance with the Specifications. The drawings will show the proposed <br />layout of the panels, including panel identification numbers, field seams, and any details that do not <br />conform to the Construction Drawings. <br /> <br />The QA/QC Inspectors will maintain an up to date panel layout drawing that shows the following: <br />(i) roll numbers; (ii) panel numbers; (iii) seam numbers; (iv) test locations; (v) repair locations; and, <br />(vi) non-destructive testing information. <br /> <br />During panel placement operations, the QA/QC Inspector will: <br /> <br /> Record panel numbers and dimensions on the panel/seam log. <br /> <br /> Observe the panel surface as it is deployed and record all panel defects and defect <br />corrective actions (panel rejected, patch installed, extrudate placed over the defect, etc.) <br />on the repair sheet. Verify that corrective actions are made in accordance with the <br />Specifications. <br /> <br /> Verify that equipment used during deployment operations does not damage the <br />geomembrane. Verify that equipment used on the geomembrane does not leak <br />hydrocarbons onto the geomembrane or that corrective measures are taken to prevent <br />leakage. <br /> <br /> Verify that the surface beneath the geomembrane has not deteriorated since previous <br />acceptance. Verify that no stones, construction debris, or other items are beneath the <br />geomembrane that could damage the geomembrane. <br /> <br /> Verify that the geomembrane is not dragged across an unprotected surface. If the <br />geomembrane is dragged across an unprotected surface, the geomembrane must be <br />inspected for scratches and repaired or rejected, if necessary. <br /> <br /> Record weather conditions including temperature, approximate wind speed and direction, <br />and approximate humidity. Verify that the geomembrane is not deployed in the presence <br />of excess moisture (fog, dew, mist, etc.). In addition, verify that the geomembrane is not <br />placed when the air temperature is less than 400F, or when standing water or frost is on <br />the ground. <br /> <br /> Verify that crews working on the geomembrane do not smoke, wear shoes that could <br />damage the liner, or engage in activities that could damage the geomembrane. <br />
The URL can be used to link to this page
Your browser does not support the video tag.